A data center was proposed near me.
Five quick steps: your situation → who's behind it → what it costs you → what to do this week → a downloadable action pack for your next meeting. Free, sourced, and works without an account.
Your situation
Who's really behind it
What it will cost your community
If you only know acreage: a typical campus runs 50–100 MW per large building; mid-size campuses are 200–500 MW.
What to do this week
Precedents worth citing
Open the source links before you quote one — a precedent you cannot cite is worse than none at all.
Your action kit
Everything below is pre-filled with your numbers: a printable action pack (speech, letters, and outreach playbook), ready-to-paste social posts, and a one-page campaign website you can host for free.
🎤 Your 2-minute public comment (pre-filled)
✉ Ready-to-send letters (records · PUC · council)
Replace the [BRACKETED] placeholders and send. All three are also in the action pack.
📢 Post it — Nextdoor, Ring, Facebook & more
Copy-paste posts with your numbers filled in — replace the [BRACKETS]. Then the platform playbook.
🪪 Rally your neighbors
🌐 Your campaign website (free to host)
A complete one-page site with your numbers baked in.
Download index.html, then drag it onto
Netlify Drop or
GitHub Pages — both free — and share the link.
Go deeper
Model CBA clauses → Hearing questions Full impact calculator How this hits your bill
As of May 2026 (3m ago) · changes weekly — re-check before citing · Source: EIA — Electric Power Monthly, Table 5.6.A: average retail price of electricity to residential customers by state (the current figure, updated monthly)
**Rates** are EIA Electric Power Monthly Table 5.6.A, May 2026 — all 51 refreshed together from the published table rather than spot-edited, so cross-state comparisons stay valid. Note this is a single month, not an annual average: residential prices are seasonal, and May is a shoulder month, so summer-peaking states may run higher than shown. The refresh moved rates up a mean of 18.6%, and 48 of 51 jurisdictions (50 states plus D.C.) rose. The largest increases land in the PJM footprint and other data-center-dense markets — D.C. +61%, Illinois +55%, Maryland +36%, Ohio +36%, New York +34% — which is the correlation worth raising at a hearing, though correlation is all it is: this table cannot attribute a rate increase to a cause. **Carbon intensities** are state annual averages and move far more slowly than prices; they were not part of this refresh and remain broadly usable. **Water stress** is a coarse low/medium/high banding, not a basin-level assessment — a state marked 'low' can still contain a stressed watershed, which is the scale that actually decides a cooling permit.