Delaware: data centers & your electric bill
As of October 1, 2026, AI GridWatch tracks 4 data center moratoriums or pushback actions in Delaware: 2 in force, 1 proposed, 1 expired, rejected or rescinded. The state has 22 tracked data center facilities using an estimated 0.4 TWh of electricity a year.
Everything GridWatch tracks in Delaware on one page — proposed projects, moratoriums, permits, officials, and the 2026 ballot.
Subscribe by RSS — moratorium changes and community headlines for Delaware.
As of July 2026 (3m ago) · changes over months · Source: U.S. Data Center Power Map by State — ElectricChoice.com compilation (updated July 2026; CC-BY 4.0). Underlying load research: LBNL 2024 US Data Center Energy Usage Report; rates: EIA
Facility counts vary by directory because each one draws the boundary differently — DataCenterMap lists 44 in Alabama where this table says 35, since it counts small network rooms alongside hyperscale campuses. Cite the TWh figure rather than the facility count when you can; it is the number that speaks to grid impact. Underlying load research is LBNL-2001637 (Dec 2024).
1Proposed data centers in Delaware
GridWatch is not yet tracking a named project in Delaware. That is a gap in our coverage, not evidence that nothing is proposed — most projects surface first in a zoning agenda, weeks before any reporting.
2Pushback already happening in Delaware
| Where | Level | Status | Note | Source |
|---|---|---|---|---|
| Delaware (SB 353) | State | Defeatedterm not documented | SB 353: statewide moratorium on permits for 100+ MW data centers through Jan 31, 2027; motion to suspend rules failed 6-15 in the Senate. Legislature passed a restrictions package (HB 233/HB 445/HB 310/SB 326) instead | SourceOfficial read 2026-09-07 |
| Dover | Local | Proposedterm not documented | 18-month moratorium on acceptance, processing, review, approval and issuance of permits for new data centers; council committee voted unanimously to advance to full council; would be first Delaware municipality with a temporary ban | SourceNews read 2026-09-07 |
| New Castle County | County | Enactedno end date — permanent | Council voted 12-0 for zoning regulations: 1,000-foot residential buffer (500 ft with noise study), closed-loop cooling required, energy-efficient backup generators, decommissioning funds; existing projects exempt | SourceNews read 2026-09-07 |
| Kent County | County | Enactedno end date — permanent | LC26-06: data centers permitted only in Limited Industrial and General Industrial zones in unincorporated areas; 300-foot residential buffer, 6-foot vegetative buffers, noise limits, written utility capacity documentation required; county attorney reviewing viability of a complete ban | SourceNews read 2026-09-07 |
As of August 2026 (2m ago) · changes weekly — re-check before citing
Illustrative rather than exhaustive — dozens of localities churn weekly, and this tracks the ones we have read a source for. **Each row carries its own provenance.** Rows showing a verification date link to the ordinance, the enacting body's own page, or a datable report of the vote, and were read on that date. Rows marked *unverified* came from bulk compilation and have not been checked against a primary source — the locality, the year, and the status may all be off. Verify one of those with the town clerk before citing it as precedent. **Expiry is derived, not asserted.** A row with a documented end date flips to *Expired* on its own once that date passes. A time-limited moratorium whose start date was never documented keeps showing as enacted — that is a known gap, not a claim that it is still in force. Moratoriums are also routinely extended, so an expiry date is the earliest it could have ended, not proof that it did.
3Every data center already built in Delaware
GridWatch does not yet track a named hyperscale campus in Delaware, but that does not mean the state has none. DataCenterMap keeps a public directory of existing facilities — street addresses included — for Delaware.
Browse the Delaware directory →
Two caveats before you cite it at a hearing: it lists facilities that already exist, so a newly proposed campus will not appear; and it counts a small network room the same as a hyperscale campus, so the facility count is not a measure of power draw or community impact.
4Your regulator
Delaware Public Service Commission — website · file a complaint
Official state energy data: EIA Delaware electricity profile — generation, prices, and consumption from the U.S. Energy Information Administration.
5Where the Delaware paper trail lives
Air & environmental permits: Delaware DNREC — Division of Air Quality
No searchable register. Delaware does not publish a permit database you can query. A public-records request to the agency is the only route to the file.
Grid interconnection queue: PJM Interconnection (Mid-Atlantic, Ohio Valley)
A routing hint only — several states are split between markets, and the serving utility is the only authority on which queue a given site is in.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records.
6Your federal delegation and governor
Grades cross party — this is an issue axis, not a partisan one. A blank grade means no documented action was located, never that the official is neutral.
| Grade | Official | Documented action (sourced) | Reach them |
|---|---|---|---|
| — | Matt Meyer Democratic · Governor | No documented action on data centers located | site · contact |
| — | Christopher A. Coons Democratic · Senator · on the 2026 ballot | No documented action on data centers located Mixed Coons introduced the Liquid Cooling for AI Act with Sen. McCormick in November 2025, directing GAO and DOE to assess liquid cooling to cut data centers' electricity and water use, saying AI leadership "shouldn't have to mean skyrocketing energy bills for American families." sources | site · contact |
| — | Lisa Blunt Rochester Democratic · Senator · next on the ballot 2030 | No documented action on data centers located | site · contact |
| — | Sarah McBride Democratic · Representative At-Large | No documented action on data centers located | site · contact |
Roster: regenerated by scripts/refresh_officials.py (Senate XML + congress-legislators + current governors).
Write to your senators → Your senators in detail → Full officials scorecard → Find your state legislators →
72026 U.S. Senate race
PVI D+8 · Seat held by Chris Coons (Democratic) · Incumbent running
Chris Coons (Democratic) · incumbent No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
E. No-Trump Hansen (Democratic) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Jeff Appelhans (Democratic) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
John Shulli (Republican) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Mary Louve (Democratic) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Michael Katz (Republican) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Ballot roster: state candidate list (read 2026-08-25).
82026 U.S. House races in Delaware (1)
A documented data-center record exists in 1 of 1 districts. A candidate with no badge colour has said nothing we could locate — that is a gap in the record, not a neutral position. ★ marks an incumbent.
| District | PVI | Incumbent | Candidates |
|---|---|---|---|
| DE-AL | D+8 | Sarah McBride | Sarah McBride ★ Earl Cooper John Whalen Joseph Arminio |
The documented records (1 district)
DE-AL
Sarah McBride (Democratic) · incumbent Guardrails
Pressed Trump administration on data center community impacts; co-sponsored Liquid Cooling for AI Act; secured $5M for cooling technology
- Pressed Trump administration at Science, Space, and Technology hearing on data center community impacts; raised concerns about strain on energy and water supply and utility costs (2026-01-14 — source)
- Co-sponsored H.R. 5332, Liquid Cooling for AI Act: bipartisan bill directing GAO to assess liquid cooling for AI compute and HPC facilities (2025-09-15 — source)
- Secured $5M for Chemours liquid cooling technology — two-phase immersion cooling that can reduce water use, cut cooling energy by up to 90%, and shrink footprints by up to 60% (2025-07-01 — source)
- Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)
Record read 2026-09-11.
9Latest Delaware data center news
A data center was proposed near you?
The free toolkit walks you through it in five steps: who's really behind the LLC, what it costs your community, what to do this week, and a downloadable action pack — speech, letters, flyer, and CBA targets included.
State municipal league: Delaware League of Local Governments