Rhode Island: data centers & your electric bill
As of October 1, 2026, AI GridWatch tracks 3 data center moratoriums or pushback actions in Rhode Island: 3 in force. The state has 8 tracked data center facilities using an estimated 0.2 TWh of electricity a year.
Everything GridWatch tracks in Rhode Island on one page — proposed projects, moratoriums, permits, officials, and the 2026 ballot.
Subscribe by RSS — moratorium changes and community headlines for Rhode Island.
As of July 2026 (3m ago) · changes over months · Source: U.S. Data Center Power Map by State — ElectricChoice.com compilation (updated July 2026; CC-BY 4.0). Underlying load research: LBNL 2024 US Data Center Energy Usage Report; rates: EIA
Facility counts vary by directory because each one draws the boundary differently — DataCenterMap lists 44 in Alabama where this table says 35, since it counts small network rooms alongside hyperscale campuses. Cite the TWh figure rather than the facility count when you can; it is the number that speaks to grid impact. Underlying load research is LBNL-2001637 (Dec 2024).
1Proposed data centers in Rhode Island
GridWatch is not yet tracking a named project in Rhode Island. That is a gap in our coverage, not evidence that nothing is proposed — most projects surface first in a zoning agenda, weeks before any reporting.
2Pushback already happening in Rhode Island
| Where | Level | Status | Note | Source |
|---|---|---|---|---|
| Smithfield | Local | Enactedno end date — permanent | Adopted 4-1 May 5, effective Jun 4; data centers not permitted in any zoning district | SourceNews read 2026-08-04 |
| Charlestown | Town | Enactedno end date — permanent | Adopted unanimously (5-0); data centers and battery energy storage systems not permitted in any zoning district. Second RI town to ban data centers after Smithfield. No active proposals at time of vote; preemptive action citing Quonset and Smithfield controversies. Planning Commission unanimously endorsed in July. | SourceNews read 2026-09-12 |
| Westerly | Town | Enactedexpires 2027-07-27 | Adopted 7-0; one-year moratorium on development or construction of data centers. Allows Planning and Zoning Commission time to draft comprehensive zoning rules. Town ordinances were previously silent on data centers. No pending applications at time of vote. | SourceNews read 2026-09-12 |
As of August 2026 (2m ago) · changes weekly — re-check before citing
Illustrative rather than exhaustive — dozens of localities churn weekly, and this tracks the ones we have read a source for. **Each row carries its own provenance.** Rows showing a verification date link to the ordinance, the enacting body's own page, or a datable report of the vote, and were read on that date. Rows marked *unverified* came from bulk compilation and have not been checked against a primary source — the locality, the year, and the status may all be off. Verify one of those with the town clerk before citing it as precedent. **Expiry is derived, not asserted.** A row with a documented end date flips to *Expired* on its own once that date passes. A time-limited moratorium whose start date was never documented keeps showing as enacted — that is a known gap, not a claim that it is still in force. Moratoriums are also routinely extended, so an expiry date is the earliest it could have ended, not proof that it did.
3Every data center already built in Rhode Island
GridWatch does not yet track a named hyperscale campus in Rhode Island, but that does not mean the state has none. DataCenterMap keeps a public directory of existing facilities — street addresses included — for Rhode Island.
Browse the Rhode Island directory →
Two caveats before you cite it at a hearing: it lists facilities that already exist, so a newly proposed campus will not appear; and it counts a small network room the same as a hyperscale campus, so the facility count is not a measure of power draw or community impact.
4Your regulator
Rhode Island Public Utilities Commission — website · file a complaint
Official state energy data: EIA Rhode Island electricity profile — generation, prices, and consumption from the U.S. Energy Information Administration.
5Where the Rhode Island paper trail lives
Air & environmental permits: Rhode Island DEM — Office of Air Resources
No searchable register. Rhode Island does not publish a permit database you can query. A public-records request to the agency is the only route to the file.
Grid interconnection queue: ISO New England
A routing hint only — several states are split between markets, and the serving utility is the only authority on which queue a given site is in.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records.
6Your federal delegation and governor
Grades cross party — this is an issue axis, not a partisan one. A blank grade means no documented action was located, never that the official is neutral.
| Grade | Official | Documented action (sourced) | Reach them |
|---|---|---|---|
| — | Dan McKee Democratic · Governor | No documented action on data centers located | site · contact |
| B | Jack Reed Democratic · Senator · on the 2026 ballot | Co-led the New England senators' letter asking ISO New England how it will shield residential ratepayers from data-center-driven price increases. — Sens. Reed & Whitehouse seek answers on how regional data centers could drive up costs (2026) Guardrails Co-led a New England senators' letter asking ISO New England how it will shield residential ratepayers from data-center-driven price increases. sources | site · contact |
| A | Sheldon Whitehouse Democratic · Senator · next on the ballot 2030 | Co-led the New England senators' letter to ISO New England on data-center-driven rate increases; earlier urged the White House not to fast-track data centers past clean-air, water and cost protections. — Sens. Reed & Whitehouse seek answers on how regional data centers could drive up costs (2026) Guardrails Co-led the January 2026 ISO New England letter on data-center-driven rate increases and in December 2024 urged the White House not to fast-track data-center buildout at the expense of clean-air, clean-water and household-cost protections. sources | site · contact |
| — | Gabe Amo Democratic · Representative 1 | No documented action on data centers located | site · contact |
| — | Seth Magaziner Democratic · Representative 2 | No documented action on data centers located | site · contact |
Roster: regenerated by scripts/refresh_officials.py (Senate XML + congress-legislators + current governors).
Write to your senators → Your senators in detail → Full officials scorecard → Find your state legislators →
72026 U.S. Senate race
PVI D+8 · Seat held by Jack Reed (Democratic) · Incumbent running
Connor Burbridge (Democratic) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Jack Reed (Democratic) · incumbent No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Luis Munoz (Democratic) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Raymond McKay (Republican) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Michael Bahry (Independent) No record found
No documented statement or action on data centers located. Not scored — see how this page treats silence.
Ballot roster: state candidate list (read 2026-08-25).
82026 U.S. House races in Rhode Island (2)
A documented data-center record exists in 2 of 2 districts. A candidate with no badge colour has said nothing we could locate — that is a gap in the record, not a neutral position. ★ marks an incumbent.
| District | PVI | Incumbent | Candidates |
|---|---|---|---|
| RI-1 | D+12 | Gabe Amo | Gabe Amo ★ Kellie Keenan Pedro DeSouza |
| RI-2 | D+4 | Seth Magaziner | Seth Magaziner ★ Stephen Skoly Vic Mellor |
The documented records (2 districts)
RI-1
Gabe Amo (Democratic) · incumbent Consensus vote only
On the record only for voting yes on H.R. 9340, the Ratepayer Protection Act (417-3). No other data-center record located yet.
- Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)
Record read 2026-09-22.
RI-2
Seth Magaziner (Democratic) · incumbent Consensus vote only
On the record only for voting yes on H.R. 9340, the Ratepayer Protection Act (417-3). No other data-center record located yet.
- Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)
Record read 2026-09-22.
9Latest Rhode Island data center news
No Rhode Island data-center headlines in this week's national scan — local coverage often runs ahead of it.
Search live Rhode Island data center news → GridWatch news feed →
A data center was proposed near you?
The free toolkit walks you through it in five steps: who's really behind the LLC, what it costs your community, what to do this week, and a downloadable action pack — speech, letters, flyer, and CBA targets included.
State municipal league: Rhode Island League of Cities and Towns