Project dossier · Falls Township (Bucks County), Pennsylvania

AWS Falls Township campus (Keystone Trade Center) Approved

Second initial site of Amazon's $20B+ Pennsylvania investment: a data center at NorthPoint Development's Keystone Trade Center (1,800-acre former U.S. Steel Fairless Works site), including conversion of a planned 1M sq ft distribution building on a 247-acre parcel at 1 Ben Fairless Drive and a broader ~2M sq ft, 10-structure digital infrastructure campus. Falls Township supervisors approved revised preliminary/final land development plans for the data center use in March 2025.

Key facts

Operator
Amazon (AWS)
Owner
NorthPoint Development (Keystone Trade Center)
Tenant
Amazon (AWS)
Size
247 ac
Location
Falls Township (Bucks County), Pennsylvania
First proposed
2025-06-09
Stage today
Approved

Source
read 2026-08-14

What to do next

Next step: Approved — pivot from stopping it to a binding CBA: enforceable caps on noise, water and cost, plus a community benefit.

Build an action pack for this project →

What has happened so far (2 events)

  • undatedvote
    In March 2025, Falls Township supervisors approved revised preliminary and final land development plans converting the planned Building 6 distribution center at 1 Ben Fairless Drive to data center use. · source
  • 2025-06-09announcement
    Falls Township announced Amazon will open a data center at the NorthPoint Development Keystone Trade Center site as part of Amazon's $20 billion Pennsylvania investment, with 1,250 jobs expected locally. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 40.170, -74.790 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 1 headline archived.

Around here

Other tracked projects in Pennsylvania

Cite this page: GridWatch AI, “AWS Falls Township campus (Keystone Trade Center)”, aigridwatch.com/projects/aws-falls-township-pa, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).