AWS Falls Township campus (Keystone Trade Center) Approved
Second initial site of Amazon's $20B+ Pennsylvania investment: a data center at NorthPoint Development's Keystone Trade Center (1,800-acre former U.S. Steel Fairless Works site), including conversion of a planned 1M sq ft distribution building on a 247-acre parcel at 1 Ben Fairless Drive and a broader ~2M sq ft, 10-structure digital infrastructure campus. Falls Township supervisors approved revised preliminary/final land development plans for the data center use in March 2025.
Key facts
- Operator
- Amazon (AWS)
- Owner
- NorthPoint Development (Keystone Trade Center)
- Tenant
- Amazon (AWS)
- Size
- 247 ac
- Location
- Falls Township (Bucks County), Pennsylvania
- First proposed
- 2025-06-09
- Stage today
- Approved
Source
read 2026-08-14
What to do next
Next step: Approved — pivot from stopping it to a binding CBA: enforceable caps on noise, water and cost, plus a community benefit.
What has happened so far (2 events)
- undatedvote
In March 2025, Falls Township supervisors approved revised preliminary and final land development plans converting the planned Building 6 distribution center at 1 Ben Fairless Drive to data center use. · source - 2025-06-09announcement
Falls Township announced Amazon will open a data center at the NorthPoint Development Keystone Trade Center site as part of Amazon's $20 billion Pennsylvania investment, with 1,250 jobs expected locally. · source
Find the paper trail
Find the paper trail (0 filed · 11 places to look)
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- Pennsylvania DEPThe program page: which permits this state requires, and the office that issues them.
- DEP Data Center Permit Tracker (the only state register built for data centers — it already feeds this tracker)Searchable public filings — search the operator, the shell LLC on the deed, and the address.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Falls Township (Bucks County) planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Falls Township (Bucks County) property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- PJM Interconnection (Mid-Atlantic, Ohio Valley) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- Pennsylvania Public Utility Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 40.170, -74.790 — search that point with a 5-mile radius.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Recent news
Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 1 headline archived.
Around here
- Pennsylvania briefing — rates, grid carbon, PUC contacts.
Other tracked projects in Pennsylvania
- 900 Conshohocken Road data center (former Cleveland-Cliffs steel mill) — Plymouth Township (Montgomery County), 27 mi Awaiting decision
- King of Prussia campus (MLP Ventures) — Upper Merion Township (Montgomery County), 32 mi Denied
- Pennhurst Data Center Campus — East Vincent Township (Chester County), 42 mi Denied
- PECO - Limerick Distribution Project — East Coventry / Lower Pottsgrove / Limerick Townships (Chester / Montgomery County), 43 mi In review
- Project Forge Data Center — East Whiteland Township (Chester County), 43 mi In review
Cite this page: GridWatch AI, “AWS Falls Township campus (Keystone Trade Center)”, aigridwatch.com/projects/aws-falls-township-pa, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).