Project dossier · Hanover Township (Washington County), Pennsylvania

Prime Data Centers — Starpointe Business Park campus Awaiting decision

Prime Data Centers filed a conditional-use application in May 2026 for a seven-building, ~1.7 million sq ft data center campus with an attached behind-the-meter 450 MW gas-fired power plant on roughly 126 acres of reclaimed strip-mine land in the Starpointe Business Park (land owned by ALTIAN Development LLC), near the Pavilion at Starlake. The Aug. 5 conditional-use hearing drew 200+ residents; about three dozen won party status, and residents' attorneys argued the application belongs before the zoning hearing board rather than the supervisors, so the hearing was continued to Aug. 31 without Prime presenting.

Key facts

Operator
Prime Data Centers
Filing LLC
Prime Data Centers LLC
Size
450 MW
Acres
126
Location
Hanover Township (Washington County), Pennsylvania
Hearing
2026-08-31
Stage today
Awaiting decision

Source
read 2026-08-14

What to do next

Next step: Heard 2026-08-31; decision pending. Call the board clerk for the vote date and get on the notification list.

Build an action pack for this project →

What has happened so far (5 events)

  • undatedfiling
    Prime Data Centers LLC filed a conditional-use application in May 2026 for a seven-building data center with an attached power generation facility in the Starpointe Business Park. · source
  • 2026-03-01rezoning
    Hanover Township adopted an ordinance regulating data center development during a meeting in March 2026, before Prime Data Centers LLC submitted its Starpointe application. · source
  • 2026-07-27coverage
    CBS Pittsburgh reported that residents were mounting an 11th-hour fight against the proposed Starpointe data center ahead of the Aug. 5 hearing, citing health concerns from infrasound, noise and emissions and criticizing the township's data center ordinance as insufficiently protective on setbacks and noise. · source
  • 2026-08-05hearing
    Conditional-use hearing before Hanover Township supervisors drew hundreds of residents; roughly three dozen were granted party standing, and residents' attorneys argued the zoning hearing board must first determine the data center's comparable use, so the hearing was continued to Aug. 31. · source
  • 2026-08-31hearing
    Continued conditional-use hearing scheduled for 6 p.m. at the Hanover VFD Firehall. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 40.350, -80.440 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 3 headlines archived.

Around here

Other tracked projects in Pennsylvania

Cite this page: GridWatch AI, “Prime Data Centers — Starpointe Business Park campus”, aigridwatch.com/projects/hanover-township-starpointe-pa, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.