1155 Powers Ferry Place data center (Prime Storage site) Approved
Marietta City Council voted 5-2 on Aug 12, 2026 to approve rezoning for an 18 MW, 90,000 sq ft data center at Prime Storage's ~11-acre Powers Ferry Place property near I-75 and Delk Road — the city's second data center. Conditions include silencers on coolers/generators, an independent sound study, no connection to municipal water, and Prime Storage agreeing not to build data centers at its other Marietta sites. The application predated the six-month moratorium the council passed July 8.
Key facts
- Owner
- Prime Group Holdings
- Size
- 18 MW
- Acres
- 11
- Location
- Marietta (Cobb County), Georgia
- Hearing
- 2026-08-12
- Decided
- 2026-08-12
- Stage today
- Approved
Source
read 2026-08-14
What to do next
Next step: Approved — pivot from stopping it to a binding CBA: enforceable caps on noise, water and cost, plus a community benefit.
What has happened so far (9 events)
- 2026-07-01endorsement
The Cobb Chamber of Commerce approved the Prime Group data center project in July 2026, according to Atlanta News First. · source - 2026-07-02coverage
East Cobb News reported that a request to rezone 10.7 acres at 1155 Powers Ferry Place to allow an 18-megawatt data center in the existing Prime Storage building, with about 21,570 square feet of mission-critical space, was set to be heard by the city; the applicant's name was blacked out on the zoning application. · source - 2026-07-08vote
The council passed a six-month moratorium on new data center applications (through Dec. 31, 2026); the 18 MW Powers Ferry Place application, filed before the freeze took effect, was not covered by it. · source - 2026-07-08vote
At the July 8 council meeting, Councilwoman Cheryl Richardson moved to table the Powers Ferry Place data center proposal, citing noise and asking for a sound and light study plus additional buffer space; the proposal was tabled until August 12. · source - 2026-07-08coverage
Atlanta Press Collective reported the Marietta Planning Commission voted 4-3 to recommend approval of the 1155 Powers Ferry Place data center rezoning, a shift from previous data center approvals that had passed unanimously, amid growing community opposition. · source - 2026-07-14coverage
CRE Daily reported residents pushing back on Prime Group's plan, noting the Marietta Planning Commission had endorsed the project about a week before the council delayed its decision and imposed a six-month moratorium through December 31. · source - 2026-07-28protest
Community organizers, including the group Marietta BLU, scheduled a town hall for July 28 near the proposed data center site. · source - 2026-08-12vote
After more than two hours of public comment at a capacity meeting, the council approved the rezoning 5-2, with conditions including silencers, an independent sound study, site monitoring, and no municipal water/electricity connection. · source - 2026-08-12protest
During the Marietta City Council meeting some protesters were escorted out by police, and residents raised concerns about noise and environmental pollution, especially to the nearby Rottenwood Creek. · source
Find the paper trail
Find the paper trail (0 filed · 11 places to look)
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- Georgia EPD — Air Protection BranchThe program page: which permits this state requires, and the office that issues them.
- Search Georgia EPD — Air Protection Branch for this projectsearchThis state publishes no searchable permit database, so a written records request to the agency is the reliable route. Use this search only to find the right office.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Marietta (Cobb County) planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Marietta (Cobb County) property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- No organised market covers this statenoteThere is no public queue to read. The record is the utility's integrated resource plan and its filings at the PUC — plus FERC eLibrary for anything federally docketed.
- Georgia Public Service Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 33.950, -84.550 — search that point with a 5-mile radius.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Recent news
7 stories tracked since 2026-07-08 across 6 outlets. 5× A community is pushing back on a nearby data center. 2× Local officials are moving to pause or block the project. Most recent: “Marietta, Georgia just approved a second data center in a 5-2 vote despite a six-month moratorium the council passed last month, because the 18-megawatt application was filed before the freeze took effect” (NewsBreak: Local News & Alerts, 2026-08-14).
- Marietta, Georgia just approved a second data center in a 5-2 vote despite a six-month moratorium the council passed last month, because the 18-megawatt application was filed before the freeze took effect
- Marietta data center project approved after hours of heated debate
- Marietta City Council approves data center off Delk Road
- Marietta approves controversial data center rezoning after hours of debate
- Marietta council votes 5-2 for new data center
- Marietta data center opponents plan rally before council meeting
- Proposed data center on Powers Ferry Place in Marietta faces backlash
Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 7 headlines archived.
Around here
- Cobb County community briefing — Enactedexpires 2027-02-15
- Georgia briefing — rates, grid carbon, PUC contacts.
Other tracked projects in Georgia
- xAI QTS Atlanta — Atlanta, 14 mi In review
- I-20/Liberty Road Data Center — Douglas County, 20 mi Denied
- Microsoft Fairwater Atlanta — Fayetteville (Fayette County), 37 mi
- Stillwater data center campus (Panhandle Road) — Lovejoy (Clayton County), 38 mi Withdrawn
- Social Circle data center complex (Fairplay Drive / Roy Malcom Road tracts) — Social Circle (Walton County), 52 mi Approved
Cite this page: GridWatch AI, “1155 Powers Ferry Place data center (Prime Storage site)”, aigridwatch.com/projects/marietta-powers-ferry-data-center, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).