Project dossier · Richland Parish, Louisiana

Meta Hyperion Approved

Approved and under construction - a ~5 GW, ~$27B campus. Louisiana approved new Entergy natural-gas generation to serve it; ratepayer cost allocation is the live fight, not the siting.

Key facts

Operator
Meta
Owner
Meta / Blue Owl
Tenant
Meta
Size
5,000 MW
Location
Richland Parish, Louisiana
Decided
2026-01-01
Stage today
Approved

Source
read 2026-08-07

What to do next

Next step: Approved — pivot from stopping it to a binding CBA: enforceable caps on noise, water and cost, plus a community benefit.

Build an action pack for this project →

What has happened so far (11 events)

  • 2024-12-04announcement
    Gov. Jeff Landry and Meta announced on December 4, 2024 that Meta will build a $10 billion AI data center on a 2,250-acre site in Richland Parish, described as Meta's largest data center, with construction continuing through 2030. · source
  • 2025-08-20vote
    The Louisiana Public Service Commission approved Entergy Louisiana's application on August 20, 2025 to construct three new gas plants and related transmission to power Meta's Richland Parish data center, despite opposition. · source
  • 2025-10-16construction
    Heavy construction equipment was documented at the Meta data center site in Holly Ridge, Louisiana on October 16, 2025. · source
  • 2025-12-01construction
    Entergy Louisiana broke ground on December 1, 2025 on a pair of gas power plants at the Franklin Farms Power Station in Richland Parish to serve Meta's data center, with the complex expected operational in late 2028. · source
  • 2025-12-01report
    In December 2025 the PSC adopted a regulatory framework aligned with Gov. Landry's 'Lightning Speed Initiative' to expedite approvals for large industrial projects; tensions between commissioners surfaced at the meeting. · source
  • 2026-01-01news
    Campus scaled to ~5 GW and ~$27B (up from an announced $10B); Entergy's plan for ten new gas units to serve it advanced through the Louisiana PSC (early 2026). · source
  • 2026-01-14filing
    Earthjustice filed a motion on January 14, 2026 requesting that the PSC investigate the Meta-Blue Owl financing deal's impact on ratepayer protections. · source
  • 2026-02-25denial
    The Louisiana PSC declined on February 25, 2026 to investigate Meta's financing arrangement with Blue Owl Capital, alarming consumer and environmental groups. · source
  • 2026-04-15vote
    The Louisiana PSC voted on April 15, 2026 to adopt a fast-track schedule for Entergy Louisiana's application to build seven additional gas plants for the Hyperion project, with a final decision scheduled for December 2026. · source
  • 2026-07-28announcement
    Meta announced in late July 2026 that it is expanding its Hyperion data center in Richland Parish to 5 gigawatts of compute capacity at a total cost of more than $50 billion, more than double the previous $27 billion budget. · source
  • 2026-08-12ruling
    The Louisiana PSC voted 3-1 on August 12, 2026 to reject an administrative law judge's recommendation, allowing Meta to avoid complying with subpoenas and keep Richland Parish data center details confidential. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 32.420, -91.760 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in Louisiana

Cite this page: GridWatch AI, “Meta Hyperion”, aigridwatch.com/projects/meta-hyperion-richland-parish-la, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search