Project dossier · Pahrump (Nye County), Nevada

Manse Technology Campus (formerly Project Blackjack) Awaiting decision

Gigawatt Development proposes a ~900-acre, multi-phase technology campus south of Carpenter Canyon Road along SR-160 at the south end of Pahrump Valley, pledging closed-loop cooling using under 300 acre-feet of water per year (~1.5% of the Pahrump Basin's annual yield) on water rights it already owns, with no tax abatements sought; the application predates the county's June 2026 temporary moratorium on new data center applications. The 'August vote' was on Nye County Bill 2026-11, a proposed ban on data centers in communities without elected town boards: at the Aug 4 commission meeting it did not come to a vote, and commissioners instead moved toward putting the question to voters, with a possible special election (earliest January 2027) to be discussed Aug 18.

Key facts

Operator
Gigawatt Development
Size
900 ac
Location
Pahrump (Nye County), Nevada
Hearing
2026-08-18
Stage today
Awaiting decision

Source
read 2026-08-14

What to do next

Next step: Heard 2026-08-18; decision pending. Call the board clerk for the vote date and get on the notification list.

Build an action pack for this project →

What has happened so far (8 events)

  • 2026-07-15filing
    Manse Technology Campus LLC was formed as a Nevada limited liability company, the entity behind Gigawatt Development's proposed Pahrump data center campus. · source
  • 2026-07-18protest
    Several dozen Pahrump residents rallied at the intersection of Highway 160 and Highway 372 as part of the AI Data Center National Day of Protest, citing concerns about the town's sole-source aquifer, electricity costs, and noise. · source
  • 2026-07-18report
    Pahrump resident Justyne Lobello hosted an 'AI and Data Centers: 101' educational presentation at the Pahrump Community Library at 1 p.m., drawing a large crowd of concerned residents amid the proposed data center development. · source
  • 2026-07-21announcement
    Manse Technology issued a press release announcing project details, describing an estimated $18.4 billion technology campus with no property tax abatements proposed. · source
  • 2026-07-25hearing
    Nye County held a town hall/forum on the proposed Manse Technology Campus at the commission building in Pahrump; a large crowd attended inside and outside the venue, with residents opposing the project chiefly over water use. · source
  • 2026-08-03hearing
    The Manse Technology Campus team scheduled a public informational meeting for August 3 at 6 p.m. at the Pahrump Nugget Events Center to present the project and take questions. · source
  • 2026-08-04hearing
    Nye County Bill 2026-11, a proposed ban on data centers in areas without elected town boards, did not come to a vote; Commissioner Jabbour successfully moved to pursue a ballot question instead, with a possible special election to be discussed Aug 18. Over 3,400 people signed a petition supporting the ban and hundreds attended, most speaking against data center development. · source
  • 2026-08-06hearing
    The Nye County Water District Governing Board held a roughly two-and-a-half-hour discussion on August 6 featuring a presentation on the proposed Manse Technology Campus by Russ Meads of Double M Construction. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 36.210, -115.980 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in Nevada

Cite this page: GridWatch AI, “Manse Technology Campus (formerly Project Blackjack)”, aigridwatch.com/projects/pahrump-manse-technology-campus, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).