State briefing

Kansas: data centers & your electric bill

As of October 1, 2026, AI GridWatch tracks 19 data center moratoriums or pushback actions in Kansas: 14 in force, 3 proposed, 2 expired, rejected or rescinded. The state has 22 tracked data center facilities using an estimated 0.4 TWh of electricity a year.

Everything GridWatch tracks in Kansas on one page — proposed projects, moratoriums, permits, officials, and the 2026 ballot.

Subscribe by RSS — moratorium changes and community headlines for Kansas.

22tracked data center facilities
0.4 TWhestimated annual DC electricity
15.1¢residential rate per kWh
420grid gCO₂/kWh · water stress: medium

As of July 2026 (3m ago) · changes over months · Source: U.S. Data Center Power Map by State — ElectricChoice.com compilation (updated July 2026; CC-BY 4.0). Underlying load research: LBNL 2024 US Data Center Energy Usage Report; rates: EIA

Facility counts vary by directory because each one draws the boundary differently — DataCenterMap lists 44 in Alabama where this table says 35, since it counts small network rooms alongside hyperscale campuses. Cite the TWh figure rather than the facility count when you can; it is the number that speaks to grid impact. Underlying load research is LBNL-2001637 (Dec 2024).

Happening now
1Proposed data centers in Kansas (3)

3 still live · 0 decided or withdrawn. Each name links to the full dossier — ownership, intelligence log, and where to read the paper trail.

ProjectWhereSizeBehind itStageSource
Astra data center campus (Digital Realty)De Soto (Johnson County)600 MWDigital RealtyIn reviewSource
read 2026-08-08
Compass Wakarusa CampusShawnee County (Wakarusa area, near Topeka)600 acCompass DatacentersIn reviewSource
Project BluestemTonganoxie (Leavenworth County)600 MWCloverleaf InfrastructureIn reviewSource
read 2026-08-14

Full project tracker →

2Pushback already happening in Kansas
WhereLevelStatusNoteSource
Shawnee CountyLocalEnactedexpires 2027-02-172-1: no final action on data center land use applications until Feb 17, 2027. Applications may still be filed — Compass Datacenters can resubmit — they just cannot be decidedSourceNews
read 2026-08-23
Sedgwick CountyLocalEnactedexpires 2026-12-24Interim development control on data center applications, first adopted January 2026 and extended three times — to Jun 11, to Sep 11, and on Sep 2, 2026 (unanimous) through Dec 24, 2026 — while planning staff write zoning rules; commission checkpoint Dec 2SourceNews
read 2026-09-04
Lyon CountyLocalEnactedexpires 2027-01-22Resolution 12-26: 6-month pause on new data center and battery energy storage projects, unanimous, running through Jan 22, 2027, to let the county strengthen zoning rules. A companion Resolution 13-26 pauses utility-scale solar through Dec 1, 2026. Unincorporated areas only — it does not reach Emporia's Flint Hills Digital Campus. Outlets split on the vote date between Thu Jul 23 and Fri Jul 24; Jul 23 is the ThursdaySourceNews
read 2026-08-23
EmporiaLocalProposedterm not documentedCitizen initiative to ban high-impact data centers, ordered onto the Nov 2026 ballot by the Lyon County District Court after the city commission asked the court to review it. The petition followed zoning changes the commission approved earlier in 2026 that would allow data centers in the city. NOT settled: the declaratory judgment action on whether the measure is a proper subject for citizen initiative under Kansas law is still pending, and a yes vote may not take effect until it is decided. A parallel petition on battery energy storage is also before the court. Distinct from the Lyon County resolution, which covers unincorporated land onlySourceNews
read 2026-08-23
McPherson CountyCountyEnactedno end date — permanentResolution 2026-21; permanent ban on data centers and utility-scale battery storage in unincorporated areas. Voted 3-0. Replaced earlier moratorium from summer 2025.SourceNews
read 2026-09-06
Riley CountyCountyEnactedexpires soon — 2026-11-126-month moratorium on data centers and battery energy storage systems through Nov 12, 2026.SourceNews
read 2026-09-06
Saline CountyCountyEnactedexpires 2029-03-013-year moratorium on data centers, nuclear power, and hydrogen energy facilities in unincorporated areas through March 1, 2029.SourceNews
read 2026-09-06
Leavenworth CountyCountyExpiredterm ran to 2026-08-1190-day moratorium passed 4-1 re: Project Bluestem (1,000-acre hyperscale DC near Tonganoxie). Extension failed 3-2 on Aug 5. Moratorium expired ~Aug 11. Board voted 4-1 on Aug 13 to revisit a hold before new commission in January but did not formally re-enact. Community group retained attorney for legal fight.SourceNews
read 2026-09-11
TopekaLocalEnactedexpires 2027-07-14Unanimously approved 12-month moratorium on data centers and battery storage. Later amended to restrict utility connections both inside and outside city limits for data centers. Shawnee County (already in registry) separately approved 6-month moratorium.SourceNews
read 2026-09-11
Pottawatomie CountyCountyProposedterm not documentedPublic hearing Aug 20 at St. Bernard Catholic Church in Wamego; 125-150 attendees; 33 speakers mostly called for moratorium. County was developing data center overlay district regulations. No moratorium enacted — county chose regulatory path instead. A petition also circulated calling for pause.SourceNews
read 2026-09-06
Harvey CountyCountyEnactedexpires 2028-12-31Commission unanimously approved moratorium on data centers/crypto in unincorporated areas through end of 2028; cited concerns about water from Equus Beds AquiferSourceNews
read 2026-09-11
Kingman CountyCountyEnactedterm not documentedResolution No. 2026-R9 imposing temporary moratorium on data centers in unincorporated countySourceNews
read 2026-09-11
WichitaCityExpiredterm ran to 2026-09-10City-level moratorium on new data center development, extended through Sep 10, 2026; separate from Sedgwick County moratoriumSourceOfficial
read 2026-09-11
South HutchinsonCityEnactedexpires 2027-05-26One-year moratorium on large-scale data centers and battery energy storage systems; revised after original draft would have halted even small-scale container-sized data centersSourceNews
read 2026-09-11
Miami CountyCountyEnactedfixed term, end date not recordedThree-year moratorium restricting data centers, battery storage, and similar technologies in unincorporated areas; excludes Osawatomie's in-city Project Catalyst siteSourceNews
read 2026-09-11
Geary CountyCountyEnactedexpires 2027-06-2212-month moratorium unanimously adopted; planning commission to meet monthly to discuss regulations during moratoriumSourceNews
read 2026-09-11
El DoradoCityEnactedexpires soon — 2026-11-30Moratorium on high-impact data centers (>10 MW or >100k gal/day water) and Tier 2/3 battery storage; enacted while city deals with citizen petition (700+ signatures) seeking permanent banSourceNews
read 2026-09-11
LawrenceCityEnactedexpires 2028-07-1424-month moratorium unanimously approved on large-scale data center development; originally proposed as 1-year, extended to 2; also initiated text amendment to land development codeSourceNews
read 2026-09-11
Kansas (SB 531)StateProposedterm not documentedWould prohibit new large-load data centers (10+ MW) in counties with drought emergency declared in preceding 3 years; referred to Senate Utilities Committee Mar 10, no further actionSourceNews
read 2026-09-11

As of August 2026 (2m ago) · changes weekly — re-check before citing

Illustrative rather than exhaustive — dozens of localities churn weekly, and this tracks the ones we have read a source for. **Each row carries its own provenance.** Rows showing a verification date link to the ordinance, the enacting body's own page, or a datable report of the vote, and were read on that date. Rows marked *unverified* came from bulk compilation and have not been checked against a primary source — the locality, the year, and the status may all be off. Verify one of those with the town clerk before citing it as precedent. **Expiry is derived, not asserted.** A row with a documented end date flips to *Expired* on its own once that date passes. A time-limited moratorium whose start date was never documented keeps showing as enacted — that is a known gap, not a claim that it is still in force. Moratoriums are also routinely extended, so an expiry date is the earliest it could have ended, not proof that it did.

3Other Kansas communities in the news (2)

Places with archived data-center coverage but no moratorium on file. Grouped automatically from headlines and not verified — a lead worth reading, not a claim to cite.

Story tracker →

Already built
4Every data center already built in Kansas

GridWatch does not yet track a named hyperscale campus in Kansas, but that does not mean the state has none. DataCenterMap keeps a public directory of existing facilities — street addresses included — for Kansas.

Browse the Kansas directory →

Two caveats before you cite it at a hearing: it lists facilities that already exist, so a newly proposed campus will not appear; and it counts a small network room the same as a hyperscale campus, so the facility count is not a measure of power draw or community impact.

Your leverage
5Your regulator

Kansas Corporation Commission — website · file a complaint

Official state energy data: EIA Kansas electricity profile — generation, prices, and consumption from the U.S. Energy Information Administration.

6Where the Kansas paper trail lives

Air & environmental permits: Kansas KDHE — Bureau of Air

No searchable register. Kansas does not publish a permit database you can query. A public-records request to the agency is the only route to the file.

Grid interconnection queue: Southwest Power Pool (Plains)

A routing hint only — several states are split between markets, and the serving utility is the only authority on which queue a given site is in.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records.

What to request, and in what order →

Who represents you
7Your federal delegation and governor

Grades cross party — this is an issue axis, not a partisan one. A blank grade means no documented action was located, never that the official is neutral.

GradeOfficialDocumented action (sourced)Reach them
—Laura Kelly
Democratic · Governor
No documented action on data centers locatedsite · contact
—Jerry Moran
Republican · Senator · next on the ballot 2028
No documented action on data centers locatedsite · contact
ARoger Marshall
Republican · Senator · on the 2026 ballot
Introduced a resolution backing the Ratepayer Protection Pledge — tech companies pay their own grid costs — and opposes tax incentives for data centers. — Sen. Marshall applauds expansion of the Ratepayer Protection Pledge (2026)
Guardrails Marshall introduced a Senate resolution backing the Ratepayer Protection Pledge, has said Kansans should not pay higher bills for data centers, opposes tax incentives for them, and supports the county moratoriums in Kansas. sources
site · contact
—Tracey Mann
Republican · Representative 1
No documented action on data centers locatedsite · contact
—Derek Schmidt
Republican · Representative 2
No documented action on data centers locatedsite · contact
—Sharice Davids
Democratic · Representative 3
No documented action on data centers locatedsite · contact
—Ron Estes
Republican · Representative 4
No documented action on data centers locatedsite · contact

Roster: regenerated by scripts/refresh_officials.py (Senate XML + congress-legislators + current governors).

Write to your senators → Your senators in detail → Full officials scorecard → Find your state legislators →

82026 U.S. Senate race

PVI R+8 · Seat held by Roger Marshall (Republican) · Incumbent renominated

Adam Hamilton (Democratic) No record found

No documented statement or action on data centers located. Not scored — see how this page treats silence.

Roger Marshall (Republican) · incumbent No record found

No documented statement or action on data centers located. Not scored — see how this page treats silence.

Tech & utility PAC money: $16,500 from 5 committees (FEC, cycle 2026, pulled 2026-08-26) — FEC record

Ballot roster: state candidate list (read 2026-08-25).

All 35 Senate races →

92026 U.S. House races in Kansas (4)

A documented data-center record exists in 4 of 4 districts. A candidate with no badge colour has said nothing we could locate — that is a gap in the record, not a neutral position. ★ marks an incumbent.

DistrictPVIIncumbentCandidates
KS-1R+16Tracey MannLauren Reinhold Tracey Mann ★
KS-2R+10Derek SchmidtDerek Schmidt ★ Don Coover
KS-3D+2Sharice DavidsSharice Davids ★ Eric Jenkins
KS-4R+12Ron EstesRon Estes ★ Katy Tyndell
The documented records (4 districts)

KS-1

Lauren Reinhold (Democratic) Guardrails

Supports community-approved projects with transparency, opposes tax breaks for data centers

  • Statement supporting community-approved projects with transparency and opposing tax breaks for data centers; 'there is no one-size-fits-all approach for this district' (2026-09-11 — source)

Record read 2026-09-11.

Tracey Mann (Republican) · incumbent Consensus vote only

On the record only for voting yes on H.R. 9340, the Ratepayer Protection Act (417-3). No other data-center record located yet.

  • Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)

Record read 2026-09-22.

KS-2

Derek Schmidt (Republican) · incumbent Mixed

Conditionally supportive; advises communities that developers should not get tax abatements and should use new power sources and closed water systems

  • Town hall advice: data center developers should not require tax abatements, should source power from new sources to avoid raising local utility costs, and modern data centers can use closed systems with minimal water (2026-06-10 — source)
  • Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)

Record read 2026-09-11.

KS-3

Sharice Davids (Democratic) · incumbent Guardrails

No data center should move forward if it raises costs, wastes water, or shifts the burden onto Kansas communities

  • Statement: 'no data center should move forward if it raises electricity costs for families, wastes our limited water resources, or shifts the burden onto Kansas communities' (2026-09-11 — source)
  • Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)

Record read 2026-09-11.

KS-4

Ron Estes (Republican) · incumbent Consensus vote only

On the record only for voting yes on H.R. 9340, the Ratepayer Protection Act (417-3). No other data-center record located yet.

  • Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)

Record read 2026-09-22.

All 440 House races →

Stay informed
10Latest Kansas data center news

No Kansas data-center headlines in this week's national scan — local coverage often runs ahead of it.

Search live Kansas data center news → GridWatch news feed →

11Video coverage mentioning Kansas
▶
Sedgwick County commissioners to consider data center moratorium extension

All video coverage for Kansas →

A data center was proposed near you?

The free toolkit walks you through it in five steps: who's really behind the LLC, what it costs your community, what to do this week, and a downloadable action pack — speech, letters, flyer, and CBA targets included.

Start here → The health risks, sourced