Kansas: data centers & your electric bill
The numbers residents cite at hearings — grid, water, and regulator contacts for Kansas, from the free GridWatch toolkit.
Subscribe by RSS — moratorium changes and community headlines for Kansas.
As of July 2026 · changes over months · Source: U.S. Data Center Power Map by State — ElectricChoice.com compilation (updated July 2026; CC-BY 4.0). Underlying load research: LBNL 2024 US Data Center Energy Usage Report; rates: EIA
Facility counts vary by directory because each one draws the boundary differently — DataCenterMap lists 44 in Alabama where this table says 35, since it counts small network rooms alongside hyperscale campuses. Cite the TWh figure rather than the facility count when you can; it is the number that speaks to grid impact. Underlying load research is LBNL-2001637 (Dec 2024).
Your regulator
Kansas Corporation Commission — website · file a complaint
Official state energy data: EIA Kansas electricity profile — generation, prices, and consumption from the U.S. Energy Information Administration.
Pushback already happening in Kansas
| Where | Level | Status | Note | Source |
|---|---|---|---|---|
| Shawnee County | Local | Enacted | Temporary moratorium on new data center applications | Unverified |
As of August 2026 · changes weekly — re-check before citing
Illustrative rather than exhaustive — dozens of localities churn weekly, and this tracks the ones we have read a source for. **Each row carries its own provenance.** Rows showing a verification date link to the ordinance, the enacting body's own page, or a datable report of the vote, and were read on that date. Rows marked *unverified* came from bulk compilation and have not been checked against a primary source — the locality, the year, and the status may all be off. Verify one of those with the town clerk before citing it as precedent. **Expiry is derived, not asserted.** A row with a documented end date flips to *Expired* on its own once that date passes. A time-limited moratorium whose start date was never documented keeps showing as enacted — that is a known gap, not a claim that it is still in force. Moratoriums are also routinely extended, so an expiry date is the earliest it could have ended, not proof that it did.
Every data center already built in Kansas
GridWatch does not yet track a named hyperscale campus in Kansas, but that does not mean the state has none. DataCenterMap keeps a public directory of existing facilities — street addresses included — for Kansas.
Two caveats before you cite it at a hearing: it lists facilities that already exist, so a newly proposed campus will not appear; and it counts a small network room the same as a hyperscale campus, so the facility count is not a measure of power draw or community impact.
Latest Kansas data center news
Bly Road residents file 52-page lawsuit to stop Independence AI data center project
Independence neighbors sue to stop construction of $150 billion AI data center
Residents of Kansas town don’t trust data center plans. They want to vote on a ban
Lost sleep, NDAs & closed meetings: Inside lawsuit to halt Independence data center
State municipal league: League of Kansas Municipalities
A data center was proposed near you?
The free toolkit walks you through it in five steps: who's really behind the LLC, what it costs your community, what to do this week, and a downloadable action pack — speech, letters, flyer, and CBA targets included.