Project Bluestem In review
Cloverleaf Infrastructure proposes Project Bluestem, a 600 MW hyperscale data center on approximately 1,000 acres of former Tailgate Ranch land south of Tonganoxie. The Leavenworth County Commission passed a 90-day moratorium on data center applications in May 2026, which expired in August. On August 5, commissioners voted 3-2 against extending the moratorium. On August 13, officials reversed course and directed planning and zoning to delay regulation recommendations until after a joint work session before the September meeting. No formal application has been submitted.
Key facts
- Operator
- Cloverleaf Infrastructure
- Owner
- Cloverleaf Infrastructure
- Size
- 600 MW
- Acres
- 1,000
- Location
- Tonganoxie (Leavenworth County), Kansas
- First proposed
- 2026-02-01
- Stage today
- In review
Source
read 2026-08-14
What to do next
Next step: An application is in the record. Ask the planning office for the next hearing date and request formal notice.
What has happened so far (9 events)
- 2026-03-18hearing
Leavenworth County residents pack public forum on proposed data center. · source - 2026-03-26announcement
Coverage identified Cloverleaf Infrastructure as the developer of Project Bluestem, a conceptual 1,000-acre data center near Tonganoxie that could require up to 1.2 gigawatts of power and would receive a 100% sales and use tax abatement for 20 years, with no formal applications yet submitted. · source - 2026-04-26protest
The opposition group Citizens Against Bluestem held its inaugural meeting at the Tonganoxie VFW Post Home, drawing roughly 150 attendees; speakers included County Commissioner Mike Stieben and a Sierra Club representative. · source - 2026-05-01vote
Leavenworth County Commission passes 90-day moratorium on data center applications. · source - 2026-05-19protest
The Tongie Data Center Watch Dog Group planned to present a petition to the Tonganoxie City Council at 7 p.m. on Monday, May 19, seeking an 18-month moratorium on data center development. · source - 2026-06-09meeting
Project Bluestem representatives held an open house at 304 Venue in Tonganoxie to address resident concerns about the proposed data center. · source - 2026-08-05vote
Commission votes 3-2 against extending moratorium; moratorium expires. · source - 2026-08-13vote
Officials reverse course, direct P&Z to delay recommendations until joint work session in September. · source - 2026-08-14hearing
About 100 protesters organized by the Tongie Data Center WatchDog Group packed the Leavenworth County planning meeting, where the planning commission voted 8-1 to revisit data center regulations. · source
Find the paper trail
Find the paper trail (0 filed · 11 places to look)
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- Kansas KDHE — Bureau of AirThe program page: which permits this state requires, and the office that issues them.
- Search Kansas KDHE — Bureau of Air for this projectsearchThis state publishes no searchable permit database, so a written records request to the agency is the reliable route. Use this search only to find the right office.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Tonganoxie (Leavenworth County) planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Tonganoxie (Leavenworth County) property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- Southwest Power Pool (Plains) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- Kansas Corporation Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 39.100, -95.090 — search that point with a 5-mile radius.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Recent news
- Massive data center proposal faces potential legal battle as Tonganoxie neighbors voice noise, power concerns
- Moratorium expires on Tonganoxie data center project; citizen group plans lawsuit
- Tonganoxie residents submit petition for 18-month moratorium on data centers
Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 3 headlines archived.
Around here
- Leavenworth County community briefing — Expiredterm ran to 2026-08-11
- Kansas briefing — rates, grid carbon, PUC contacts.
Other tracked projects in Kansas
- Astra data center campus (Digital Realty) — De Soto (Johnson County), 10 mi In review
- Compass Wakarusa Campus — Shawnee County (Wakarusa area, near Topeka) In review
Cite this page: GridWatch AI, “Project Bluestem”, aigridwatch.com/projects/tonganoxie-project-bluestem, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).