Applied Digital Harwood ND Under construction
$3B, 280MW data center in Harwood, North Dakota. Under construction.
Key facts
- Operator
- Applied Digital
- Owner
- Applied Digital
- Size
- 280 MW
- Location
- Harwood, North Dakota
- Stage today
- Under construction
What to do next
Next step: Under construction — pull the approved conditions and permits and hold the builder to them; an expansion or a new building reopens the record.
What has happened so far (19 events)
- 2025-08-18announcement
Applied Digital announced Polaris Forge 2, a $3 billion, 280MW AI data center campus on 900+ contracted acres southeast of Harwood, ND, with plans to break ground in September 2025. · source - 2025-08-25public-comment
About 300 residents attended a town hall at the Harwood Community Center; some shouted when is the vote? and accused the town of having sold out. · source - 2025-08-25protest
Community members voiced anger and pressed for more disclosure, citing concerns about transparency in the approval process. · source - 2025-08-28filing
City of Fargo moved to annex roughly 800 acres near Harwood including the proposed data center site; Applied Digital said it would formally protest the annexation. · source - 2025-09-02rezoning
Harwood City Council voted unanimously on first reading to rezone roughly 320 acres from agricultural to light industrial, after a contentious session with public shouting. · source - 2025-09-10vote
Harwood City Council gave final approval to rezone the 320-acre site in about 25 minutes at a special meeting, even as Fargo continued to pursue annexation. · source - 2025-09-15construction
Construction crews observed breaking ground on the Polaris Forge 2 site near Harwood. · source - 2025-10-22financing
Applied Digital announced a roughly $5 billion, 15-year, 200MW AI factory lease with an unnamed US-based investment-grade hyperscaler (later reported as Oracle) at Polaris Forge 2, with right of first refusal on an additional 800MW. · source - 2025-10-29coverage
Reporting revealed Harwood and Fargo mayors had signed NDAs with Applied Digital covering project details, raising open-records concerns and prompting draft state legislation to ban such NDAs by public officials. · source - 2025-11-24vote
Harwood City Council voted unanimously to reject a draft agreement proposed by Fargo that would have set conditions in exchange for dropping its annexation attempt. · source - 2025-12-08vote
Fargo City Commission voted unanimously to cancel its annexation of roughly 300 acres including the data center site and voted 4-1 to send a separate disputed annexation into mediation with Harwood. · source - 2026-02-01public-comment
Dakota Resource Council held a public meeting on the Harwood data center drawing about 100 attendees; the group said it wants projects to be transparent and beneficial to host communities. · source - 2026-03-10financing
Applied Digital closed a $2.15 billion private offering of 6.750% senior secured notes (maturing 2031) to fund construction of roughly 200MW at the Harwood campus. · source - 2026-03-23utility
Reporting detailed Applied Digital backing of the Agassiz Transmission Line and Substation project with Minnkota Power Cooperative to deliver the 280MW needed for the Harwood campus. · source - 2026-04-02utility
Minnkota disclosed the cost of the Agassiz transmission line rose from about $75 million to $110 million due to tight timelines and tariffs; Applied Digital will cover the full cost with no charge to other customers. · source - 2026-04-29ruling
North Dakota Public Service Commission approved the $110 million Agassiz Transmission Line and Substation, targeting operational by fall 2026. · source - 2026-05-11coverage
Statewide reporting examined the lack of ND state-level siting authority for data centers, noting the PSC has virtually no say over location, and a failed 2025 bill (HB 1427) that would have granted it. · source - 2026-07-13announcement
Applied Digital confirmed it was expanding its ND footprint and eyeing Oliver County for a third data center campus. · source - 2026-08-01coverage
Harwood residents still felt left in the dark about the data center months after approval, citing the town NDA-driven negotiation process as an example of insufficient transparency. · source
Find the paper trail
Find the paper trail (0 filed · 12 places to look)
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- North Dakota DEQ — Division of Air QualityThe program page: which permits this state requires, and the office that issues them.
- Search North Dakota DEQ — Division of Air Quality for this projectsearchThis state publishes no searchable permit database, so a written records request to the agency is the reliable route. Use this search only to find the right office.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Harwood planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Harwood property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- MISO (Midwest & Gulf) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- Southwest Power Pool (Plains) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- North Dakota Public Service Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Around here
- North Dakota briefing — rates, grid carbon, PUC contacts.
Other tracked projects in North Dakota
- CoreWeave Ellendale ND — Ellendale
Cite this page: GridWatch AI, “Applied Digital Harwood ND”, aigridwatch.com/projects/applied-digital-harwood-nd, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).