CoreWeave Ellendale ND
Chip types: B200. Epoch AI estimates ~68 MW.
Key facts
- Operator
- CoreWeave
- Owner
- CoreWeave
- Tenant
- OpenAI
- Size
- 68 MW
- Location
- Ellendale, North Dakota
- Stage today
Source
read 2026-08-14
What to do next
Next step: Already operating — the leverage now is enforcement: noise and water conditions, tax revenue tracking, and any expansion filing, which reopens the record.
What has happened so far (17 events)
- 2022-09-08construction
Applied Blockchain (now Applied Digital) broke ground on a 180 MW data center facility in Ellendale, North Dakota (Dickey County), its second North Dakota site, with a five-year Energy Service Agreement signed with a local utility on September 1, 2022. · source - 2023-03-07operational
Applied Digital announced the energization of its 180 MW Ellendale facility, completed six months after groundbreaking; Marathon Digital Holdings contracted for capacity with an option for an additional 70 MW, and the project was financed through a $20 million loan from Starion Bank. · source - 2023-06-16operational
Applied Digital held a ribbon-cutting ceremony celebrating the energization of its 180 MW Ellendale facility, attended by local congressional and state representatives; the company received final regulatory approval from the North Dakota Public Service Commission for its Electric Service Agreement. · source - 2023-10-31construction
Applied Digital broke ground on a separate 100 MW, 342,000-square-foot HPC facility at the Ellendale campus designed for AI workloads including generative AI and machine learning, with capacity for nearly 50,000 Nvidia H100 SXM-class GPUs in a liquid-cooled configuration. · source - 2024-01-16announcement
Applied Digital signed a conditional anchor tenant agreement at the Ellendale HPC facility for 100 MW over 10 years valued at approximately $2.2 billion, pending finalization of definitive lease documents and construction financing. · source - 2024-03-08announcement
Applied Digital extended the 45-day negotiation period for the conditional anchor tenant agreement at the Ellendale HPC facility until March 30, 2024, with the 100 MW, 10-year deal still under negotiation. · source - 2024-04-01financing
Applied Digital issued a $50 million unsecured convertible debenture to a single private investor with a 54-week term and no interest payments, with proceeds directed toward construction of the Ellendale HPC data center. · source - 2024-05-24financing
Applied Digital issued a $42.1 million unsecured convertible debenture to advance construction of the Ellendale HPC data center, with a 54-week term, no interest, and a 5% original issue discount. · source - 2024-06-07financing
Applied Digital secured a $125 million debt facility (expandable to $200 million) from CIM Group at 12% annual interest for a 3-year term, exclusively for buildout of the Ellendale HPC campus. · source - 2024-12-17construction
Applied Digital announced the successful energization of the on-site main substation transformer at the Ellendale HPC campus, enabling equipment commissioning; the company also submitted a petition for property annexation to the City of Ellendale and received the Community Impact award at the 18th Annual Data Center Dynamics Awards. · source - 2025-02-12financing
Applied Digital closed a $375 million interim financing with Sumitomo Mitsui Banking Corporation (SMBC) to repay a Macquarie Capital note and fund development of the first and second buildings at the Ellendale HPC campus. · source - 2025-04-30financing
Applied Digital entered into a $150 million convertible preferred equity facility with institutional investors to advance development of the Ellendale multi-building HPC campus, with draws at company discretion in $25 million increments over a 36-month term. · source - 2025-06-02announcement
Applied Digital announced a 250 MW AI data center lease with CoreWeave at the Ellendale campus for approximately 15 years, with an optional 150 MW expansion to 400 MW total; the first 100 MW building expected operational in Q4 2025 and the second 150 MW building by mid-2026, with anticipated total revenue of approximately $7 billion. · source - 2025-08-29announcement
Applied Digital finalized an additional 150 MW lease with CoreWeave at the Polaris Forge 1 campus in Ellendale, bringing total contracted capacity to 400 MW across three lease agreements with approximately 15-year terms and total anticipated revenue of approximately $11 billion. · source - 2025-10-27operational
Applied Digital achieved Ready for Service for Phase 1 (50 MW) of the first 100 MW building at Polaris Forge 1 in Ellendale for CoreWeave, featuring proprietary liquid cooling with near-zero water consumption. · source - 2026-06-09financing
Applied Digital priced $1.59 billion in 7.000% senior secured notes due 2031 to fund construction of the fourth 150 MW building (ELN-04) at Polaris Forge 1 in Ellendale and repay a Goldman Sachs bridge loan. · source - 2026-07-01operational
Applied Digital delivered Building 2 Phase 1 at Polaris Forge 1 in Ellendale, adding 75 MW and bringing total live campus capacity to 175 MW (100 MW from Building 1 plus 75 MW from Building 2), on schedule toward the 400 MW contracted total. · source
Find the paper trail
Find the paper trail (0 filed · 12 places to look)
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- North Dakota DEQ — Division of Air QualityThe program page: which permits this state requires, and the office that issues them.
- Search North Dakota DEQ — Division of Air Quality for this projectsearchThis state publishes no searchable permit database, so a written records request to the agency is the reliable route. Use this search only to find the right office.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Ellendale planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Ellendale property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- MISO (Midwest & Gulf) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- Southwest Power Pool (Plains) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- North Dakota Public Service Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 46.000, -98.530 — search that point with a 5-mile radius.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Around here
- North Dakota briefing — rates, grid carbon, PUC contacts.
Other tracked projects in North Dakota
- Applied Digital Harwood ND — Harwood Under construction
Cite this page: GridWatch AI, “CoreWeave Ellendale ND”, aigridwatch.com/projects/coreweave-ellendale-nd, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).