Project dossier · Bloomfield, Connecticut

Atlas Capital Bloomfield In review

Proposed 1M-sq-ft data center at 132 Griffin Road North; surfaced at a June 26, 2026 Town Plan and Zoning Commission meeting.

Key facts

Operator
Atlas Capital Group
Size
44 ac
Location
Bloomfield, Connecticut
Stage today
In review

Source

What to do next

Next step: An application is in the record. Ask the planning office for the next hearing date and request formal notice.

Build an action pack for this project →

What has happened so far (6 events)

  • 2025-06-26hearing
    Atlas Capital Group gave an informal, conceptual presentation to the Bloomfield Town Plan and Zoning Commission about a potential 1-million-square-foot data center at 132 Griffin Road North. · source
  • 2025-07-01coverage
    Data Center Dynamics reported that Atlas Capital Group, a New York/LA real estate investment firm, may develop a roughly 1 million-square-foot data center in Bloomfield, Connecticut. · source
  • 2025-07-01utility
    Atlas Capital representative said the project planned 127,000-square-foot open-air substation is required for a facility of this size and that the company has had preliminary talks with Eversource. · source
  • 2025-07-01coverage
    Stamford Advocate reported on the New York developer proposal for a massive data center in Bloomfield, covering the 44-acre former tobacco-field site and project scope. · source
  • 2025-07-01report
    Sentry Commercial reported conceptual plans for a roughly 1 million-square-foot data center in Hartford County, detailing the 900,000-square-foot data hall and 127,000-square-foot substation on a 44-acre parcel. · source
  • 2025-07-03announcement
    The Town of Bloomfield issued a public news release announcing Atlas Capital Group conceptual data center proposal for the Griffin Road North site. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

  • Connecticut DEEPThe program page: which permits this state requires, and the office that issues them.
  • Search Connecticut DEEP for this projectsearchThis state publishes no searchable permit database, so a written records request to the agency is the reliable route. Use this search only to find the right office.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

  • Search Bloomfield planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
  • Search Bloomfield property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in Connecticut

Cite this page: GridWatch AI, “Atlas Capital Bloomfield”, aigridwatch.com/projects/atlas-bloomfield-ct, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search