Project dossier · Lansing (Ingham County), Michigan

Deep Green downtown data center Withdrawn

24 MW data center plus a 16 MW fuel-cell plant on 2.5 acres near the Grand River downtown, with a closed-loop water-glycol cooling system (~500,000 gal/yr). The Planning Commission recommended the rezoning 5-2 in March 2026, but Deep Green withdrew its rezoning request on April 6, 2026, ending the proposal before a council vote.

Key facts

Operator
Deep Green (UK)
Size
24 MW
Acres
2
Location
Lansing (Ingham County), Michigan
Decided
2026-04-06
Stage today
Withdrawn

Source
read 2026-08-07

What to do next

Next step: Withdrawn — confirm it is dead in the record and watch for the same site resurfacing under a new name or LLC.

Build an action pack for this project →

What has happened so far (2 events)

  • 2026-03-04vote
    Lansing City Planning Commission voted 5-2 to recommend the rezoning for the 24 MW data center + 16 MW fuel-cell plant. · source
  • 2026-04-06filing
    Deep Green withdrew its rezoning application, axing the downtown proposal before City Council voted. · source

Find the paper trail

Find the paper trail (0 filed · 12 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 42.730, -84.550 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

7 stories tracked since 2026-06-16 across 6 outlets. 6× Local officials are moving to pause or block the project. 1× The dispute has escalated into litigation. Most recent: “TeraWulf suggests it will take legal action if Lansing pursues data center ban” (The Ithaca Voice, 2026-10-09).

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 7 headlines archived.

Around here

Other tracked projects in Michigan

Cite this page: GridWatch AI, “Deep Green downtown data center”, aigridwatch.com/projects/deep-green-lansing-mi, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search