Deep Green downtown data center Withdrawn
24 MW data center plus a 16 MW fuel-cell plant on 2.5 acres near the Grand River downtown, with a closed-loop water-glycol cooling system (~500,000 gal/yr). The Planning Commission recommended the rezoning 5-2 in March 2026, but Deep Green withdrew its rezoning request on April 6, 2026, ending the proposal before a council vote.
Key facts
- Operator
- Deep Green (UK)
- Size
- 24 MW
- Acres
- 2
- Location
- Lansing (Ingham County), Michigan
- Decided
- 2026-04-06
- Stage today
- Withdrawn
Source
read 2026-08-07
What to do next
Next step: Withdrawn — confirm it is dead in the record and watch for the same site resurfacing under a new name or LLC.
What has happened so far (2 events)
Find the paper trail
Find the paper trail (0 filed · 12 places to look)
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- Michigan EGLE — Air Quality DivisionThe program page: which permits this state requires, and the office that issues them.
- MiEnviro PortalSearchable public filings — search the operator, the shell LLC on the deed, and the address.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Lansing (Ingham County) planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Lansing (Ingham County) property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- MISO (Midwest & Gulf) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- PJM Interconnection (Mid-Atlantic, Ohio Valley) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- Michigan Public Service Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 42.730, -84.550 — search that point with a 5-mile radius.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Recent news
7 stories tracked since 2026-06-16 across 6 outlets. 6× Local officials are moving to pause or block the project. 1× The dispute has escalated into litigation. Most recent: “TeraWulf suggests it will take legal action if Lansing pursues data center ban” (The Ithaca Voice, 2026-10-09).
- TeraWulf suggests it will take legal action if Lansing pursues data center ban
- Lansing Town Board moves toward data center ban
- Town of Lansing to Draft Data Center Ban Following Public Anger
- ‘We just need to rip off the bandage and say no’: Lansing Town Board in favor of banning data centers
- East Lansing Extends Data Center Moratorium as City Develops New Regulations
- East Lansing extends data center moratorium as it plans zoning changes
- Lansing moves toward temporary data center moratorium
Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 7 headlines archived.
Around here
- Lansing community briefing — Enactedexpires 2027-01-25
- Michigan briefing — rates, grid carbon, PUC contacts.
Other tracked projects in Michigan
- Project Flex — Lyon Township (Oakland County), 48 mi Awaiting decision
- OpenAI Stargate Michigan — Saline, 55 mi Under construction
- Augusta Township data center (Thor Equities) — Augusta Township (Washtenaw County), 62 mi Denied
Cite this page: GridWatch AI, “Deep Green downtown data center”, aigridwatch.com/projects/deep-green-lansing-mi, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).