Project dossier · San Jose, California

Goodman Innovation Centre San Jose In review

Two-building, 414,000 sq ft data center campus (97MW) on 45.8-acre infill site bought for $200M; expected operational 2028.

Key facts

Operator
Goodman Group
Size
97 MW
Acres
46
Location
San Jose, California
Stage today
In review

Source

What to do next

Next step: An application is in the record. Ask the planning office for the next hearing date and request formal notice.

Build an action pack for this project →

What has happened so far (5 events)

  • 2023-04-03environmental
    City of San Jose released an Initial Study/Mitigated Negative Declaration for the 350 West Trimble Road Project, covering a rezoning and Planned Development Permit for a 208,000 sq ft manufacturing and assembly building on the 10.9-acre parcel. · source
  • 2023-08-16rezoning
    San Jose Planning Commission approved LBA Realty industrial project at 350 West Trimble Road: a 208,000 sq ft manufacturing/assembly building with 15 loading docks, removing 57 trees. · source
  • 2025-10-02financing
    A Goodman Group affiliate bought the 45.8-acre site at 350 and 370 West Trimble Road from an LBA Realty affiliate in an all-cash $200 million deal. · source
  • 2025-10-30announcement
    Goodman Group announced plans to redevelop the acquired Trimble Road site into the Goodman Innovation Centre San Jose, a two-building data center campus totaling roughly 414,000 sq ft with up to 97.3 MW of power available by 2028. · source
  • 2026-08-13coverage
    KQED reported that a proposed data center on West Trimble Road in San Jose would remove 224 trees to build a facility with 21 backup generators and a private electrical substation, cited amid broader resident concerns over water, power-grid strain, and health impacts. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

  • Search San Jose planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
  • Search San Jose property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in California

Cite this page: GridWatch AI, “Goodman Innovation Centre San Jose”, aigridwatch.com/projects/goodman-san-jose-ca, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search