Google Bristow
Chip types: TPU v5e,TPU v5p,TPU v6e,TPU v7. Epoch AI estimates ~279 MW.
Key facts
- Operator
- Owner
- Tenant
- Google DeepMind
- Size
- 279 MW
- Location
- Bristow (Prince William County), Virginia
- Stage today
Source
read 2026-08-14
What to do next
Next step: Already operating — the leverage now is enforcement: noise and water conditions, tax revenue tracking, and any expansion filing, which reopens the record.
What has happened so far (6 events)
- 2023-01-01operational
Google's Prince William County data center campus in Bristow, a roughly 290,000-square-foot facility on the 250-acre Mango Farm site at 13001 Rollins Ford Road, was built and became operational in 2023, according to Virginia Business. · source - 2023-11-01filing
In November 2023, Delaware-based Sharpless Enterprises LLC, a shell company linked to Google, submitted plans to the U.S. Army Corps of Engineers for a 181-acre data center campus with four buildings, an electric substation, and auxiliary structures on Wellington Road in western Prince William County, on the former Atlantic Research Corporation site. · source - 2024-03-07permit
The U.S. Army Corps of Engineers approved Sharpless Enterprises' application for the 181-acre data center complex at 6201 Wellington Road near Bristow, after reviewing potential impacts on nearby wetlands and streams; Corps biologist Anna Lawston said nothing substantial changed between the initial application and final approval. · source - 2024-04-26announcement
Google announced a $1 billion investment to expand its Virginia data centers, including its newly opened Prince William County campus and two Loudoun County sites, bringing total Virginia investment to over $4.2 billion; Governor Youngkin attended the announcement at Google's Reston headquarters. · source - 2025-08-27announcement
Google announced an additional $9 billion investment in Virginia through the end of 2026 for cloud and AI infrastructure, including expansion of existing facilities in Prince William County; the Bristow Mango Farm complex is included in the investment, per the Prince William Times. · source - 2025-08-28coverage
The Prince William Times reported that Google's Mango Farm data center complex at 13001 Rollins Ford Road in Bristow, next to Gainesville High School, occupies 250 acres with one operational data center of about 290,000 square feet, is valued at $1.2 billion by Prince William County, and has plans filed for at least two more data centers on the site. · source
Find the paper trail
Find the paper trail (1 filed · 11 places to look)
Permits already on file (1)
Filings we have a source for — the record, not a place to look for one.
- 2024-03-07
The U.S. Army Corps of Engineers approved Sharpless Enterprises' application for the 181-acre data center complex at 6201 Wellington Road near Bristow, after reviewing potential impacts on nearby wetlands and streams; Corps biologist Anna Lawston said nothing substantial changed between the initial application and final approval. · source
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- Virginia DEQThe program page: which permits this state requires, and the office that issues them.
- Search Virginia DEQ for this projectsearchThis state publishes no searchable permit database, so a written records request to the agency is the reliable route. Use this search only to find the right office.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Bristow (Prince William County) planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Bristow (Prince William County) property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- PJM Interconnection (Mid-Atlantic, Ohio Valley) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- Virginia State Corporation Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 38.730, -77.540 — search that point with a 5-mile radius.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Around here
- Virginia briefing — rates, grid carbon, PUC contacts.
Other tracked projects in Virginia
- PW Digital Gateway — Prince William County, 1 mi Withdrawn
- STACK Infrastructure NVA02 — Manassas, 4 mi Under construction
- Dulles Cloud South — Prince William County, 5 mi Denied
- Amazon Warrenton (Blackwell Road) — Warrenton (Fauquier County), 13 mi Approved
- Google Arcola — Sterling (Loudoun County), 19 mi
Cite this page: GridWatch AI, “Google Bristow”, aigridwatch.com/projects/google-bristow, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).