Project dossier · Independence, Missouri

Nebius Independence campus Approved

Nebius' first gigawatt-scale US campus: ~2.5M sq ft on 398 acres near Route 78 and Little Blue Parkway, powered by a privately financed plant at the retired Blue Valley Power Plant site. Council approved Chapter 100 abatement 5-2 and the company has broken ground.

Key facts

Operator
Nebius
Owner
Nebius
Size
800 MW
Acres
398
Location
Independence, Missouri
First proposed
2025-12-16
Decided
2026-03-02
Stage today
Approved

Source
read 2026-08-23

What to do next

Next step: Approved — pivot from stopping it to a binding CBA: enforceable caps on noise, water and cost, plus a community benefit.

Build an action pack for this project →

What has happened so far (4 events)

  • 2025-12-16announcement
    Nebius, a Dutch AI infrastructure company, was revealed as the buyer of 398 acres near NorthPoint's EastGate Commerce Center, proposing an 8-to-10-building campus that would roughly triple Independence's power capacity. · source
  • 2026-02-27hearing
    Independence weighed a Chapter 100 tax abatement for the hyperscale campus, with residents raising concerns about electricity costs and the scale of the commitment ahead of the council vote. · source
  • 2026-03-02vote
    Independence City Council approved the Chapter 100 tax abatement 5-2, alongside two series of taxable industrial development revenue bonds for the project. · source
  • 2026-03-02utility
    The city set out a power structure under which Independence Power Partners builds a privately financed generating facility at the retired Blue Valley Power Plant, delivering an initial 200 MW and 600 MW more at full operation plus 300 MW reserve, with the city taking on no debt. · source

Find the paper trail

Find the paper trail (0 filed · 12 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 39.090, -94.420 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

11 stories tracked since 2026-06-25 across 5 outlets. 3× A community is pushing back on a nearby data center. 3× Local officials are moving to pause or block the project. Most recent: “Judge could order Nebius to halt data center construction in Independence” (FOX4KC.com, 2026-10-07).

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 11 headlines archived.

Around here

Other tracked projects in Missouri

Cite this page: GridWatch AI, “Nebius Independence campus”, aigridwatch.com/projects/nebius-independence-mo, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search