Project dossier · Walnut Cove (Stokes County), North Carolina

Project Delta In review

Hyperscale data center on 1,800 acres near Dan River; 998 acres developable, rest is floodplain. Originally approved by commissioners Jan 2026 but rescinded in April after a lawsuit (SCSJ/SELC) challenged the public hearing notice. ELS reapplied in late July 2026. Planning board voted 5-2 to recommend denial on Aug 14, 2026. Commissioners make the final decision. Closed-loop cooling and possible on-site generation planned.

Key facts

Operator
Engineered Land Solutions (ELS)
Size
1,800 ac
Location
Walnut Cove (Stokes County), North Carolina
First proposed
2025-11-01
Application filed
2026-07-20
Stage today
In review

Source
read 2026-08-14

What to do next

Next step: Application filed. Ask the planning office for the hearing date and request formal notice.

Build an action pack for this project →

What has happened so far (12 events)

  • 2025-11-01announcement
    Project Delta hyperscale data center proposed near Walnut Cove. · source
  • 2025-12-01vote
    The Stokes County planning board recommended denial of the Project Delta rezoning for the first time, in December 2025, before commissioners later approved it anyway. · source
  • 2026-01-12vote
    Stokes County commissioners approve rezoning despite planning board denial and public opposition. · source
  • 2026-03-12filing
    Community groups and residents file lawsuit challenging the rezoning (SCSJ/SELC). · source
  • 2026-04-01vote
    Commissioners vote to rescind January rezoning approval after lawsuit revealed notice violations. · source
  • 2026-06-04hearing
    Engineered Land Solutions held a community information session on Project Delta on June 4, 2026, according to the Southern Coalition for Social Justice. · source
  • 2026-07-08hearing
    Engineered Land Solutions held a second community information session on Project Delta on July 8, 2026, per the Southern Coalition for Social Justice. · source
  • 2026-07-09vote
    The Stokes County planning board voted 6-1 to recommend a six-month moratorium on data center development to give the county time to study impacts. · source
  • 2026-07-13vote
    Stokes County commissioners voted 3-2 to reject the planning board's recommended six-month data center moratorium and approved text amendments regulating data centers in the county. · source
  • 2026-07-20filing
    ELS submits new conditional use application for Project Delta. · source
  • 2026-08-14vote
    Planning board votes 5-2 to recommend denial of Project Delta conditional use application. · source
  • 2026-09-08hearing
    Stokes County commissioners are scheduled to hold a public hearing on September 8, 2026 to make the final decision on the Project Delta rezoning. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 36.300, -80.140 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in North Carolina

Cite this page: GridWatch AI, “Project Delta”, aigridwatch.com/projects/stokes-county-project-delta, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).