State briefing

Utah: data centers & your electric bill

The numbers residents cite at hearings — grid, water, and regulator contacts for Utah, from the free GridWatch toolkit.

Subscribe by RSS — moratorium changes and community headlines for Utah.

48tracked data center facilities
2.6 TWhestimated annual DC electricity
13.0¢residential rate per kWh
440grid gCO₂/kWh · water stress: high

As of July 2026 · changes over months · Source: U.S. Data Center Power Map by State — ElectricChoice.com compilation (updated July 2026; CC-BY 4.0). Underlying load research: LBNL 2024 US Data Center Energy Usage Report; rates: EIA

Facility counts vary by directory because each one draws the boundary differently — DataCenterMap lists 44 in Alabama where this table says 35, since it counts small network rooms alongside hyperscale campuses. Cite the TWh figure rather than the facility count when you can; it is the number that speaks to grid impact. Underlying load research is LBNL-2001637 (Dec 2024).

Your regulator

Utah Public Service Commissionwebsite · file a complaint

Official state energy data: EIA Utah electricity profile — generation, prices, and consumption from the U.S. Energy Information Administration.

Pushback already happening in Utah

WhereLevelStatusNoteSource
Iron CountyLocalEnactedexpires 2026-11-22Ordinance 2026-13: 180-day halt on data centers, data center power plants, and solar power plants; prospective onlySource
read 2026-08-13

As of August 2026 · changes weekly — re-check before citing

Illustrative rather than exhaustive — dozens of localities churn weekly, and this tracks the ones we have read a source for. **Each row carries its own provenance.** Rows showing a verification date link to the ordinance, the enacting body's own page, or a datable report of the vote, and were read on that date. Rows marked *unverified* came from bulk compilation and have not been checked against a primary source — the locality, the year, and the status may all be off. Verify one of those with the town clerk before citing it as precedent. **Expiry is derived, not asserted.** A row with a documented end date flips to *Expired* on its own once that date passes. A time-limited moratorium whose start date was never documented keeps showing as enacted — that is a known gap, not a claim that it is still in force. Moratoriums are also routinely extended, so an expiry date is the earliest it could have ended, not proof that it did.

Known data center campuses in Utah

OperatorLocationTenantFiling LLC
MetaEagle MountainMetaCodename shells: Greater Kudu, Raven Northbrook, Stadion, Wobniar, Pinnacle Mountain

⏳ No verification date recorded · changes over months · Source: Operator ownership & filing-LLC naming patterns — compiled from operator releases and county filings, then checked against SEC EDGAR full-text search. Composite, not a single citation: look the entity up yourself before naming it in a filing

Each row carries its own attribution level — first-party rows come from the operator's own site, but colocation and REIT ownership was compiled from trade press and never passed an independent fact-check. Check the attribution column before citing a row.

Every data center already built in Utah

The campuses above are the ones GridWatch tracks by operator and filing LLC. For the full inventory — street addresses of every existing facility, including the smaller colocation and network sites — DataCenterMap keeps a public directory for Utah.

Browse the Utah directory →

Two caveats before you cite it at a hearing: it lists facilities that already exist, so a newly proposed campus will not appear; and it counts a small network room the same as a hyperscale campus, so the facility count is not a measure of power draw or community impact.

Latest Utah data center news

All Utah news → Live news search →

State municipal league: Utah League of Cities and Towns

A data center was proposed near you?

The free toolkit walks you through it in five steps: who's really behind the LLC, what it costs your community, what to do this week, and a downloadable action pack — speech, letters, flyer, and CBA targets included.

Start here → The health risks, sourced