Project dossier · White County, Indiana

Wolcott Data Center (Mid-America Commerce Park) Awaiting decision

Proposed data center at Mid-America Commerce Park, Wolcott, at the intersection of U.S. 24 and CR 1100 West. Site plans describe up to four data halls (~327,612 sq ft each), a 50,000 sq ft office building, and a 100,000 sq ft warehouse, with full build-out projected for 2029 and ~1,000 construction jobs over the build-out period; the developer's own site describes it as a 'closed-loop, minimal-water' campus seeking no incentives. Rezoning covers ~184 acres (per an Aug 2025 lawsuit) within a larger ~322-acre parcel. The rezoning applications were filed by the White County Redevelopment Commission rather than the property owners (BOWS4CRM and Liebengood Family Partnership) -- neighboring landowners Bart and Amy Snyder sued in Aug 2025 alleging the redevelopment commission lacked a notarized letter authorizing it to act as agent and that no site plan was submitted with the rezoning application, both allegedly required under White County's zoning ordinance. As of a June 2026 community open house, the project was still moving forward despite the moratorium and the pending lawsuit; White County Economic Development Organization President Randy Strasser confirmed the open house was authentic and co-hosted with the commissioners.

Key facts

Operator
Blue Ladder Development
Size
322 ac
Location
White County, Indiana
Hearing
2025-08-11
Stage today
Awaiting decision

Source
read 2026-09-02

What to do next

Next step: Heard 2025-08-11; decision pending. Call the board clerk for the vote date and get on the notification list.

Build an action pack for this project →

What has happened so far (4 events)

  • 2025-08-01lawsuit
    Bart and Amy Snyder sue the White County commissioners, the White County Redevelopment Commission, and property owners BOWS4CRM and Liebengood Family Partnership to overturn the rezoning, alleging procedural defects (no notarized agency letter, no site plan). · source
  • 2025-08-11hearing
    Area Plan Commission public hearing on the ~184-acre Mid-America Commerce Park rezoning; officials admitted no site plan had been submitted. · source
  • 2025-10-20moratorium
    White County Commissioners vote 2-1 (Davis, Pass for; Smolek against) to adopt a 12-month moratorium on data center development, expiring Oct 20, 2026. · source
  • 2026-06-29community-meeting
    Blue Ladder Development and White County commissioners co-host a public open house on the proposed data center at the Monticello Best Western. · source

Find the paper trail

Find the paper trail (0 filed · 13 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 40.760, -87.040 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

9 stories tracked since 2021-06-16 across 8 outlets. 6× A community is pushing back on a nearby data center. 3× Local officials are moving to pause or block the project. Most recent: “White County to address data center regulations” (Now Georgia, 2026-09-01).

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 9 headlines archived.

Around here

Other tracked projects in Indiana

Cite this page: GridWatch AI, “Wolcott Data Center (Mid-America Commerce Park)”, aigridwatch.com/projects/blue-ladder-wolcott-data-center-in, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search