Project dossier · Starke County, Indiana

Abei Energy data center proposal (rezoning request) Blocked by ban

Chicago-based Abei Energy's data center division emailed the Starke County Plan Commission asking about rezoning two parcels from Agricultural to Industrial. County officials disclosed the inquiry to residents on 2025-11-03; Abei was placed on the Plan Commission's 2025-11-12 agenda. Exact parcels, acreage, and project size were never disclosed publicly. The county drafted a hyperscale data center moratorium ordinance in direct response and adopted it (Ordinance 2025-37) on 2025-12-15, before Abei's proposal advanced to a rezoning vote -- so this project's outcome is 'moratorium' (blocked by the county's own timeout), not a formal denial.

Key facts

Operator
Abei Energy (data center division)
Location
Starke County, Indiana
First proposed
2025-11-03
Application filed
2025-11-03
Hearing
2025-11-12
Stage today
Blocked by ban

Source
read 2026-09-02

What to do next

Next step: Blocked by a local ban or moratorium - the project stopped at the ordinance, not at an application. Watch for the ordinance being challenged in court or allowed to lapse.

Build an action pack for this project →

What has happened so far (4 events)

  • 2025-11-03disclosure
    Starke County commissioners publicly discuss Abei Energy's inquiry with citizens after incomplete email screenshots circulated on social media; Commissioner VanDeMark says a moratorium ordinance was already being drafted at the Plan Commission. · source
  • 2025-12-04recommendation
    Starke County Plan Commission unanimously recommends a 12-month moratorium on hyperscale data center applications to the Board of Commissioners. · source
  • 2025-12-15ordinance-adopted
    Board of Commissioners adopts Ordinance 2025-37, a 12-month moratorium on permits for hyperscale (>5,000 sq ft) data centers in unincorporated Starke County, by a 3-0 vote. · source
  • 2026-07-15recommendation
    Plan Commission recommends a one-year extension of the data center moratorium; as of 2026-09 the Board of Commissioners has not been confirmed to have voted on it. · source

Find the paper trail

Find the paper trail (0 filed · 13 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 41.335, -86.620 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

43 stories tracked since 2017-05-31 across 11 outlets. 30× A community is pushing back on a nearby data center. 11× Local officials are moving to pause or block the project. Most recent: “Starke County sheriff cites public opinion, data concerns for ending Flock contract” (WNDU, 2026-09-09).

+31 more on the story tracker.

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 43 headlines archived.

Around here

Other tracked projects in Indiana

Cite this page: GridWatch AI, “Abei Energy data center proposal (rezoning request)”, aigridwatch.com/projects/abei-energy-data-center-starke-in, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search