Project dossier · Abilene, Texas

Crusoe Abilene Expansion Under construction

Data center by Microsoft in Abilene, Texas. Under construction.

Key facts

Operator
Microsoft
Owner
Microsoft
Location
Abilene, Texas
Stage today
Under construction

Source
read 2026-08-14

What to do next

Next step: Under construction — pull the approved conditions and permits and hold the builder to them; an expansion or a new building reopens the record.

Build an action pack for this project →

What has happened so far (14 events)

  • 2024-07-26announcement
    Crusoe Energy Systems announced it is building a 200 MW data center at the Lancium Clean Campus outside Abilene, Texas. · source
  • 2024-10-15financing
    Crusoe Energy Systems, Blue Owl Capital, and Primary Digital Infrastructure announced a $3.4 billion joint venture to fund and operate a 206 MW data center in Abilene, Texas. · source
  • 2024-11-21financing
    Blackstone closed a $500 million equity investment in Lancium, whose first campus in Abilene is slated to come online in 2025; the Lancium project was originally announced in 2021 for cryptocurrency mining before pivoting to AI. · source
  • 2024-11-21financing
    An SEC filing showed Crusoe Energy secured $686 million of a targeted $818 million raise from 70 investors; the Abilene campus is expected to be leased to Oracle, which will in turn rent it to Microsoft and OpenAI. · source
  • 2025-01-22announcement
    OpenAI, SoftBank, and Oracle announced the Stargate project at the White House, a venture to invest up to $500 billion in AI data center infrastructure including 10 data centers, with one already under construction in Texas. · source
  • 2025-02-06construction
    OpenAI confirmed it was breaking ground on Stargate's first site in Abilene, with a requirement to create at least 57 full-time positions earning an average wage of $57,600 annually; OpenAI VP Chris Lehane called Texas 'the flagship' for the venture. · source
  • 2025-02-06financing
    Newmark arranged $2.3 billion in financing for the 206 MW Abilene data center on behalf of Blue Owl Capital, Crusoe Energy Systems, and Primary Digital Infrastructure. · source
  • 2025-03-07announcement
    The Abilene Stargate site was expected to house 64,000 Nvidia GB200 chips by end of 2026, with an initial 16,000-chip deployment targeted for summer 2025; Oracle was reported to be in charge of operating the supercomputer. · source
  • 2025-06-01construction
    In June 2025, Crusoe, Blue Owl Capital, and Primary Digital Infrastructure entered the second phase of a $15 billion joint venture for a 1.2 GW data center in Abilene; construction on six additional buildings began in March 2025, targeted to go live by mid-2026. · source
  • 2025-09-24announcement
    At a press conference in Abilene, OpenAI, Oracle, and SoftBank announced five new Stargate data center sites totaling 7 GW, including an additional 600 MW expansion near the original Abilene location. · source
  • 2026-03-06withdrawal
    Bloomberg reported that Oracle and OpenAI ended plans to expand the flagship Abilene data center amid financing complexity and revised demand assumptions. · source
  • 2026-03-27announcement
    Crusoe announced a 900 MW expansion of its Abilene AI campus as an 'AI Factory' for Microsoft, with behind-the-meter power generation and battery storage, bringing total planned campus capacity to approximately 2.1 GW. · source
  • 2026-06-25coverage
    Data Center Knowledge reported that Crusoe is adding a 900 MW AI data center to its Abilene campus for Microsoft, bringing total planned capacity to 2.1 GW, as part of a broader analysis of Texas becoming the largest data center market. · source
  • 2026-06-30report
    A Stargate progress report noted the 1,100-acre Abilene campus moved from groundworks to energization faster than comparable campuses but suffered weather-related outages; Microsoft partnered with Crusoe to develop additional buildings, transforming the site into a multi-tenant AI infrastructure hub. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

  • Search Abilene planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
  • Search Abilene property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 32.380, -99.770 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

13 stories tracked since 2026-05-29 across 8 outlets. 12× A community is pushing back on a nearby data center. 1× Water use for cooling is straining the local supply. Most recent: “OpenAI data center constructed in Abilene, Texas” (The Lufkin Daily News, 2026-09-30).

+1 more on the story tracker.

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 13 headlines archived.

Around here

Other tracked projects in Texas

Cite this page: GridWatch AI, “Crusoe Abilene Expansion”, aigridwatch.com/projects/crusoe-abilene-expansion, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).