Project dossier · Talty (Kaufman County), Texas

Flexential Kaufman County Approved

Fourth and largest Flexential DFW-area facility; 110-acre site supports up to three 36MW buildings (108MW total); Phase 1 is 375,000 sq ft / 36MW, site work starting early 2027.

Key facts

Operator
Flexential
Size
108 MW
Acres
110
Location
Talty (Kaufman County), Texas
Stage today
Approved

Source

What to do next

Next step: Approved — pivot from stopping it to a binding CBA: enforceable caps on noise, water and cost, plus a community benefit.

Build an action pack for this project →

What has happened so far (6 events)

  • 2026-01-01filing
    The Flexential project site near Talty was released from the City of Talty extraterritorial jurisdiction (ETJ) under Texas state law after a petition was filed with Kaufman County, leaving Talty with no regulatory authority over the site. · source
  • 2026-07-01coverage
    Data Center Dynamics reported Flexential acquisition of 110 acres outside Dallas for a planned 108 MW campus, noting the design targets closed-loop cooling with zero water usage. · source
  • 2026-07-28announcement
    Flexential announced it purchased 110 acres in Kaufman County near Talty to build its fourth and largest Dallas-area data center campus, with Phase 1 comprising a 375,000 sq ft, 36 MW building and full build-out potential of 108 MW across three buildings. · source
  • 2026-07-29coverage
    Connect CRE reported Flexential land acquisition for a 375,000 sq ft, 36 MW first-phase data center about 20 minutes east of Dallas in Talty, citing Cushman and Wakefield ranking of Dallas as the world top data center market. · source
  • 2026-08-01coverage
    Unite.AI reported Flexential had secured 36 MW of power for the first building — exceeding the combined electrical capacity of its three existing Dallas-area facilities (28.4 MW). · source
  • 2026-08-06coverage
    Local press reported Talty officials say the city has no regulatory authority over the Flexential site because the property was released from the city ETJ earlier in 2026 after a Kaufman County petition. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in Texas

Cite this page: GridWatch AI, “Flexential Kaufman County”, aigridwatch.com/projects/flexential-kaufman-tx, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search