Project dossier · Hutto (Williamson County), Texas

Iron Mountain Hutto Campus In review

Seven-building data center campus proposed outside Austin near the Samsung Taylor plant, with on-site substation; exploring behind-the-meter natural gas to speed up power availability.

Key facts

Operator
Iron Mountain
Size
500 ac
Location
Hutto (Williamson County), Texas
Stage today
In review

Source

What to do next

Next step: An application is in the record. Ask the planning office for the next hearing date and request formal notice.

Build an action pack for this project →

What has happened so far (5 events)

  • 2026-03-12hearing
    Iron Mountain presented the proposed seven-building Taylor Meadows data center campus (~500 acres off FM 3349) to Hutto City Council, requesting wastewater service (~30,200 gallons/day). City Manager said the city would require substantial community benefits in exchange for service. · source
  • 2026-03-12incentive
    Iron Mountain offered Hutto potential financial benefits in exchange for wastewater service access, including a possible payment usable for debt service or to lower resident tax/utility rates. No dollar amount or finalized terms disclosed; City Council took no action. · source
  • 2026-03-19announcement
    Trade press reported Iron Mountain plan for a seven-building hyperscale Taylor Meadows campus on roughly 500 acres near Hutto — the company first Texas data center. First grid-connected buildings targeted for around 2030. · source
  • 2026-03-19coverage
    Community Impact reported the site was previously entitled for a residential subdivision of nearly 1,900 homes, and that the data center projected water use is lower than that build-out would have required. · source
  • 2026-03-19environmental
    Reporting noted that replacing the previously-approved ~1,900-home residential development with the data center campus is projected to reduce sanitary sewer/water demand. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in Texas

Cite this page: GridWatch AI, “Iron Mountain Hutto Campus”, aigridwatch.com/projects/iron-mountain-hutto-tx, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search