Project dossier · Catawba County, North Carolina

Microsoft Catawba County Under construction

$1B multi-site data center investment in Catawba County, North Carolina. Under construction.

Key facts

Operator
Microsoft
Owner
Microsoft
Location
Catawba County, North Carolina
Stage today
Under construction

Source

What to do next

Next step: Under construction — pull the approved conditions and permits and hold the builder to them; an expansion or a new building reopens the record.

Build an action pack for this project →

What has happened so far (11 events)

  • 2022-11-09announcement
    Catawba County, the Cities of Conover and Hickory, the Town of Maiden, and the Catawba County EDC jointly announced Microsoft plan to invest a minimum of $1 billion in four data centers over 10 years, creating at least 50 jobs. · source
  • 2022-11-10incentive
    Coverage detailed the incentive package: performance-based tax breaks of 50% real property tax and 85% personal property tax over 10 years, across roughly 670 acres in Conover, Hickory, and Maiden. · source
  • 2024-03-01construction
    Microsoft broke ground on the Lyle Creek campus (Project Agate) in Conover on NC Highway 16, planned for up to five data center buildings. · source
  • 2024-04-01construction
    Site construction began on the Maiden-area data center (Boyd Farms site, Project Yoga), with Morgan Construction Company starting clearing and grading work. · source
  • 2024-04-15construction
    Microsoft paused construction across its Catawba County data center campuses; the halt lasted roughly 10 months, with the company not publicly detailing the reason. · source
  • 2026-01-01construction
    Satellite monitoring detected re-mobilization activity at Microsoft Lyle Creek, Boyd Farm, and Stover North campuses in Catawba County in January-February 2026. · source
  • 2026-03-01incentive
    Microsoft sent a letter to the City of Hickory stating it intends to forgo the tax rebates promised in the 2022 incentive agreement, opting to pay full property taxes under its Community-First Infrastructure initiative. · source
  • 2026-03-02construction
    Microsoft resumed construction on its $1B Catawba County project after a roughly 10-month pause; building permits secured for sites in Conover, Hickory, Maiden, and Newton valued at $909 million, with completion obligations extending to 2032. · source
  • 2026-06-23coverage
    Catawba County, the Cities of Conover and Hickory, the Town of Maiden, and the EDC issued a joint statement defending the Microsoft project amid rising community questions, citing Microsoft tax commitment and projected water use of about 1% of Hickory daily capacity. · source
  • 2026-06-24protest
    Residents near the Conover construction site reported ongoing noise and dust; neighboring landowners voiced opposition to the loss of rural land even as county officials touted job creation and minimal water impact. · source
  • 2026-07-07environmental
    Microsoft reported its Catawba County data centers will use far less water than originally estimated, citing a 75-80% cut in projected peak water demand and 85-90% cut in wastewater demand since 2022, attributing this to closed-loop liquid cooling. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in North Carolina

Cite this page: GridWatch AI, “Microsoft Catawba County”, aigridwatch.com/projects/microsoft-catawba-county-nc, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).