Project dossier · San Antonio, Texas

Microsoft SAT14 Under construction

Chip types: H100,B300. Epoch AI estimates ~47 MW.

Key facts

Operator
Microsoft
Owner
Microsoft
Size
47 MW
Location
San Antonio, Texas
Stage today
Under construction

Source
read 2026-08-14

What to do next

Next step: Under construction — pull the approved conditions and permits and hold the builder to them; an expansion or a new building reopens the record.

Build an action pack for this project →

What has happened so far (5 events)

  • 2021-07-06filing
    Microsoft registered SAT14 Phase 1 (project TABS2021019142) with the Texas Department of Licensing and Regulation for new construction of two building shells (152,000 sq ft and 107,000 sq ft) totaling 259,000 sq ft at 3545 Wiseman Boulevard, San Antonio, Bexar County, with an estimated cost of $154.9 million. · source
  • 2021-10-01construction
    Construction began on SAT14 Phase 1 at 3545 Wiseman Boulevard, San Antonio, per the TDLR project filing; the design firm was Page Southerland Page of Austin. · source
  • 2022-12-01construction
    SAT14 Phase 1 construction was completed and the TDLR project was closed, per the filing's recorded completion date. · source
  • 2026-06-01report
    Microsoft and EY published a June 2026 economic impact report for the San Antonio datacenter campus (Bexar and Medina Counties) showing $2.34 billion in construction economic activity since 2016, operations since 2019, 635 direct Microsoft jobs in 2025, $48.4 million in incremental tax revenue in Bexar and Medina Counties, and Microsoft as the number-one taxpayer in both counties. · source
  • 2026-08-10filing
    Microsoft sent a letter to Governor Greg Abbott stating it has operated datacenters in Texas since 2016, hosts over 635 employees at its own facilities with 1,600-plus on-site contractors, and described its Community-First Infrastructure initiative and a behind-the-meter natural gas project in West Texas with Chevron. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 29.430, -98.700 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

17 stories tracked since 2026-08-17 across 10 outlets. 9× Local officials are moving to pause or block the project. 5× A community is pushing back on a nearby data center. Most recent: “How Texas Research Park became San Antonio's data center hub” (Yahoo Finance, 2026-10-09).

+5 more on the story tracker.

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 17 headlines archived.

Around here

Other tracked projects in Texas

Cite this page: GridWatch AI, “Microsoft SAT14”, aigridwatch.com/projects/microsoft-sat14, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search