Project dossier · Grant County, Indiana

Recore Digital AI data center inquiry Rumored

An inquiry, not an application. Recore Digital approached the Grant County Area Plan Commission in July 2026 about converting an existing cryptocurrency mining operation in the county into what it describes as a 'quiet, permanent AI Data Center'. The county's 24-month moratorium (Ordinance 4-2026) bars improvement-location permits for data centers in unincorporated areas until March 2028 or until the APC's data center ordinance is adopted, so the live question is what that ordinance will require; a seven-member subcommittee (four APC members, three residents) finished its first review of the draft in August 2026. Site, size, power and water figures have not been published. Coordinates are the county centroid.

Key facts

Operator
Recore Digital
Location
Grant County, Indiana
Stage today
Rumored

Source
read 2026-09-02

What to do next

Next step: Rumored only. Confirm with the planning office and file a records request to pin down what is real.

Build an action pack for this project →

What has happened so far (5 events)

  • 2025-12-01meeting
    Grant County Area Plan Commission began outlining a data center ordinance — annual energy and water reporting, client-category disclosure, infrastructure offsets, and rules for standby diesel generators and cooling noise were among the items discussed (minutes on the county's APC minutes server; secondary account at citizenportal.ai). · source
  • 2026-03-16moratorium
    Board of Commissioners adopted Ordinance 4-2026, a 24-month moratorium on data center improvement-location permits in unincorporated Grant County, 3-0, after county attorney Martin Harker read it aloud. · source
  • 2026-07-11proposal
    Chronicle-Tribune reported that Recore Digital wants to bring a 'quiet, permanent AI Data Center' to Grant County and had approached the Area Plan Commission; the APC's data center subcommittee is seven volunteers — four commission members and three from the public. · source
  • 2026-07-25coverage
    Chronicle-Tribune opinion column (Tom Marine) described the inquiry as a proposal to convert an existing cryptocurrency mining operation and argued the first applicant should not write the county's rulebook. · source
  • 2026-08-08meeting
    The APC's data center subcommittee met to complete its initial review of the draft data center ordinance; the Chronicle-Tribune described the county as 'one step closer to finalizing a data center ordinance'. · source

Find the paper trail

Find the paper trail (0 filed · 13 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 40.510, -85.660 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

24 stories tracked since 2025-10-10 across 2 outlets. 18× A community is pushing back on a nearby data center. 3× Local officials are moving to pause or block the project. Most recent: “APC to discuss additional data center moratorium on Oct. 15” (Chronicle-Tribune, 2026-10-10).

+12 more on the story tracker.

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 24 headlines archived.

Around here

Other tracked projects in Indiana

Cite this page: GridWatch AI, “Recore Digital AI data center inquiry”, aigridwatch.com/projects/recore-digital-grant-county-in, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search