Sabey Decatur Township Approved
Two-building, 900,000+ sq ft, $4B campus near Camby Rd/Kentucky Ave. Approved by Metropolitan Development Commission in March 2026 via industrial-zoning adjustment; ~90 residents protested. Residents later sued; case helped drive Indianapolis's data-center moratorium push.
Key facts
- Operator
- Sabey Data Centers
- Size
- 250 MW
- Acres
- 130
- Location
- Decatur Township (Indianapolis), Indiana
- Stage today
- Approved
What to do next
Next step: Approved — pivot from stopping it to a binding CBA: enforceable caps on noise, water and cost, plus a community benefit.
What has happened so far (12 events)
- 2025-12-18announcement
Seattle-based Sabey Data Centers sought city approval for a roughly 130-acre, two-building data center campus on industrially-zoned land near Camby Road and Kentucky Avenue in Decatur Township, telling residents the project could generate more than $20M/year in property tax revenue at full buildout. · source - 2025-12-18public-comment
Residents packed a Decatur Township Civic Council meeting at Decatur Central High School to question Sabey CEO John Sabey about the proposed data center; no speaker during public comment supported the project. · source - 2026-01-29hearing
The Metropolitan Development Commission's hearing examiner held a petition hearing on Sabey's request for a variance of use to allow the data center campus on industrially-zoned land in Decatur Township. · source - 2026-02-26hearing
The MDC hearing examiner recommended approval of Sabey's 130-acre Decatur Township data center proposal, advancing it to the full commission despite community opposition. · source - 2026-02-26protest
About 90 Decatur Township residents demonstrated outside the City-County Building against the Sabey data center, citing noise, energy demand, water use, and property-value concerns; 1,400+ had signed an opposition petition vs. 24 supporters. · source - 2026-03-18vote
The Indianapolis Metropolitan Development Commission voted to approve Sabey's variance-of-use request for a $4B, two-building, 900,000+ sq ft, ~250MW data center campus on 130 acres, making it Indianapolis's first hyperscale data center. · source - 2026-04-17lawsuit
The Decatur Township Civic Council and more than half a dozen residents filed a petition for judicial review in Marion County Superior Court to overturn the MDC's approval, arguing the variance violated state law and due-process rights and amounted to a 'disguised rezoning.' · source - 2026-04-20coverage
Coverage confirmed Decatur Township residents sued to block the $4B Sabey data center, citing noise, energy demand, water use, lack of permanent jobs, and property-value impacts. · source - 2026-06-15filing
Attorneys for Sabey and the MDC filed a motion to dismiss the residents' judicial-review petition, arguing the citizens' petition failed to meet statutory requirements. · source - 2026-07-10coverage
Council President Maggie A. Lewis announced she would seek a citywide data-center moratorium, citing the Sabey fight among the drivers of the push. · source - 2026-08-10moratorium
Indianapolis City-County Council voted 23-1 to advance a moratorium pausing approval of new data centers in Marion County through 2028, partly driven by the Sabey fight; the measure exempts the three already-approved projects including Sabey's. · source - 2026-08-19moratorium
The Metropolitan Development Commission voted 6-0 to give final approval to the citywide data-center moratorium (through Dec. 31, 2027); Sabey's Decatur Township campus was one of three already-approved projects explicitly exempted under state law. · source
Find the paper trail
Find the paper trail (0 filed · 12 places to look)
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- Indiana IDEM — Office of Air QualityThe program page: which permits this state requires, and the office that issues them.
- IDEM Virtual File CabinetSearchable public filings — search the operator, the shell LLC on the deed, and the address.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Decatur Township (Indianapolis) planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Decatur Township (Indianapolis) property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- MISO (Midwest & Gulf) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- PJM Interconnection (Mid-Atlantic, Ohio Valley) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- Indiana Utility Regulatory Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Around here
- Indianapolis (Marion County) community briefing — Enactedexpires 2027-12-31
- Indiana briefing — rates, grid carbon, PUC contacts.
Other tracked projects in Indiana
- AWS Northern Indiana expansion (New Carlisle) — New Carlisle (St. Joseph County)
- Abei Energy data center proposal (rezoning request) — Starke County Blocked by ban
- Anthropic-Amazon New Carlisle — New Carlisle
- Cloverdale Solar Farm (EnergyRe) — Putnam County Withdrawn
- DC Blox Warren Township (Thunderbird Commerce Center) — Warren Township (Indianapolis) / Irvington Approved
Cite this page: GridWatch AI, “Sabey Decatur Township”, aigridwatch.com/projects/sabey-decatur-township-in, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).