Project dossier · Putnam County, Indiana

Cloverdale Solar Farm (EnergyRe) Withdrawn

Revised proposal for a 150 MW solar farm (cut from an original ~200 MW / ~2,000 acres) in the Cloverdale area, with increased setbacks (500 ft). A Plan Commission hearing was scheduled for Jan 12, 2026 but the county's moratorium (adopted Nov 17, 2025) paused new approvals; EnergyRe later withdrew the application per the tracker's existing record. This is a solar project, not a data center — no separate data-center proposal in Putnam County was found in this research pass.

Key facts

Operator
EnergyRe
Size
150 MW
Acres
1,000
Location
Putnam County, Indiana
Hearing
2026-01-12
Stage today
Withdrawn

Source
read 2026-09-02

What to do next

Next step: Withdrawn — confirm it is dead in the record and watch for the same site resurfacing under a new name or LLC.

Build an action pack for this project →

What has happened so far (3 events)

  • undatedwithdrawn
    EnergyRe later withdrew its Putnam County solar farm application (per the tracker's existing MORATORIUMS_DF entry); exact withdrawal date not independently confirmed in this research pass. · source
  • 2025-11-17moratorium
    Putnam County Commissioners vote 2-1 (Beck, Helmer for; Woodall against) to adopt a 1-year moratorium on data centers, SMRs, solar, and wind in unincorporated Putnam County, expiring Nov 17, 2026. · source
  • 2026-01-12hearing-scheduled
    Plan Commission hearing on EnergyRe's revised 150 MW Cloverdale solar application scheduled. · source

Find the paper trail

Find the paper trail (0 filed · 13 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 39.510, -86.790 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Recent news

18 stories tracked since 2025-11-17 across 10 outlets. 11× A community is pushing back on a nearby data center. 7× Local officials are moving to pause or block the project. Most recent: “Putnam County Commission confident in data center resolution; resident group “appreciative” of concerns addressed” (WCHS Network, 2026-09-30).

+6 more on the story tracker.

Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 18 headlines archived.

Around here

Other tracked projects in Indiana

Cite this page: GridWatch AI, “Cloverdale Solar Farm (EnergyRe)”, aigridwatch.com/projects/energyre-cloverdale-solar-in, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).