State briefing

Mississippi: data centers & your electric bill

As of October 1, 2026, AI GridWatch tracks 1 data center moratorium or pushback action in Mississippi: 1 in force. The state has 20 tracked data center facilities using an estimated 0.3 TWh of electricity a year.

Everything GridWatch tracks in Mississippi on one page — proposed projects, moratoriums, permits, officials, and the 2026 ballot.

Subscribe by RSS — moratorium changes and community headlines for Mississippi.

20tracked data center facilities
0.3 TWhestimated annual DC electricity
16.2¢residential rate per kWh
400grid gCO₂/kWh · water stress: low

As of July 2026 (3m ago) · changes over months · Source: U.S. Data Center Power Map by State — ElectricChoice.com compilation (updated July 2026; CC-BY 4.0). Underlying load research: LBNL 2024 US Data Center Energy Usage Report; rates: EIA

Facility counts vary by directory because each one draws the boundary differently — DataCenterMap lists 44 in Alabama where this table says 35, since it counts small network rooms alongside hyperscale campuses. Cite the TWh figure rather than the facility count when you can; it is the number that speaks to grid impact. Underlying load research is LBNL-2001637 (Dec 2024).

Happening now
1Proposed data centers in Mississippi (6)

3 still live · 3 decided or withdrawn. Each name links to the full dossier — ownership, intelligence log, and where to read the paper trail.

ProjectWhereSizeBehind itStageSource
Clarksdale hyperscale data center siteClarksdale (Coahoma County)648 ac—In reviewSource
read 2026-08-23
Saxum Investment Data CenterJackson230 acSaxum Investment Co.In reviewSource
read 2026-08-19
AWS Madison County data center campusesMadison County—Amazon Web ServicesProposedSource
read 2026-08-14
Amazon RidgelandRidgeland228 MWAmazonUnder constructionSource
read 2026-08-14
Compass Datacenters MeridianMeridian500 MWCompass DatacentersUnder constructionSource
Amazon Madison Mega SiteCanton (Madison County)284 MWAmazonOperatingSource
read 2026-08-14

Full project tracker →

2Pushback already happening in Mississippi
WhereLevelStatusNoteSource
JacksonLocalEnactedexpires 2027-02-12183-day moratorium, 5-2 — Mississippi's first. Because the vote was not unanimous it took effect 30 days after passage (~Aug 13, 2026). Follows opposition to a 230-acre project in northwest JacksonSourceNews
read 2026-09-12

As of August 2026 (2m ago) · changes weekly — re-check before citing

Illustrative rather than exhaustive — dozens of localities churn weekly, and this tracks the ones we have read a source for. **Each row carries its own provenance.** Rows showing a verification date link to the ordinance, the enacting body's own page, or a datable report of the vote, and were read on that date. Rows marked *unverified* came from bulk compilation and have not been checked against a primary source — the locality, the year, and the status may all be off. Verify one of those with the town clerk before citing it as precedent. **Expiry is derived, not asserted.** A row with a documented end date flips to *Expired* on its own once that date passes. A time-limited moratorium whose start date was never documented keeps showing as enacted — that is a known gap, not a claim that it is still in force. Moratoriums are also routinely extended, so an expiry date is the earliest it could have ended, not proof that it did.

3Other Mississippi communities in the news (1)

Places with archived data-center coverage but no moratorium on file. Grouped automatically from headlines and not verified — a lead worth reading, not a claim to cite.

Story tracker →

Already built
4Known data center campuses in Mississippi
OperatorLocationTenantFiling LLC
Amazon (AWS)Madison CountyAmazon (AWS)Vadata, Inc. — AWS's build/operating entity on many permits
Amazon (AWS)Warren County (Vicksburg)Amazon (AWS)Vadata, Inc. — AWS's build/operating entity on many permits

⏳ No verification date recorded · changes over months · Source: Operator ownership & filing-LLC naming patterns — compiled from operator releases and county filings, then checked against SEC EDGAR full-text search. Composite, not a single citation: look the entity up yourself before naming it in a filing

Each row carries its own attribution level — first-party rows come from the operator's own site, but colocation and REIT ownership was compiled from trade press and never passed an independent fact-check. Check the attribution column before citing a row.

5Every data center already built in Mississippi

The campuses above are the ones GridWatch tracks by operator and filing LLC. For the full inventory — street addresses of every existing facility, including the smaller colocation and network sites — DataCenterMap keeps a public directory for Mississippi.

Browse the Mississippi directory →

Two caveats before you cite it at a hearing: it lists facilities that already exist, so a newly proposed campus will not appear; and it counts a small network room the same as a hyperscale campus, so the facility count is not a measure of power draw or community impact.

Your leverage
6Your regulator

Mississippi Public Service Commission — website · file a complaint

Official state energy data: EIA Mississippi electricity profile — generation, prices, and consumption from the U.S. Energy Information Administration.

7Where the Mississippi paper trail lives

Air & environmental permits: Mississippi DEQ — Air Division

No searchable register. Mississippi does not publish a permit database you can query. A public-records request to the agency is the only route to the file.

Grid interconnection queue: MISO (Midwest & Gulf)

A routing hint only — several states are split between markets, and the serving utility is the only authority on which queue a given site is in.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records.

What to request, and in what order →

Who represents you
8Your federal delegation and governor

Grades cross party — this is an issue axis, not a partisan one. A blank grade means no documented action was located, never that the official is neutral.

GradeOfficialDocumented action (sourced)Reach them
—Tate Reeves
Republican · Governor
No documented action on data centers locatedsite · contact
BCindy Hyde-Smith
Republican · Senator · on the 2026 ballot
Pressed FERC commissioners at oversight to make large loads such as data centers pay upfront so residential rates do not rise. — Sen. Hyde-Smith — FERC commissioners examine affordability as data centers proliferate (2026)
Guardrails At a FERC oversight hearing, pressed commissioners on mechanisms to make large-load customers such as data centers pay upfront so residential rates do not rise. sources
site · contact
—Roger F. Wicker
Republican · Senator · next on the ballot 2030
No documented action on data centers located
Accelerate Has celebrated Amazon's $10 billion hyperscale data-center project in Madison County as a historic investment, with no located statement on its power or ratepayer impact. sources
site · contact
—Trent Kelly
Republican · Representative 1
No documented action on data centers locatedsite · contact
—Bennie G. Thompson
Democratic · Representative 2
No documented action on data centers locatedsite · contact
—Michael Guest
Republican · Representative 3
No documented action on data centers locatedsite · contact
—Mike Ezell
Republican · Representative 4
No documented action on data centers locatedsite · contact

Roster: regenerated by scripts/refresh_officials.py (Senate XML + congress-legislators + current governors).

Write to your senators → Your senators in detail → Full officials scorecard → Find your state legislators →

92026 U.S. Senate race

PVI R+11 · Seat held by Cindy Hyde-Smith (Republican) · Incumbent renominated

Cindy Hyde-Smith (Republican) · incumbent No record found

No documented statement or action on data centers located. Not scored — see how this page treats silence.

Tech & utility PAC money: $6,000 from 2 committees (FEC, cycle 2026, pulled 2026-08-26) — FEC record

Scott Colom (Democratic) No record found

No documented statement or action on data centers located. Not scored — see how this page treats silence.

Recent mentions (1) — automated, not verified

Headlines that name this candidate and mention data centers or AI. Matched by a script, read by nobody. A mention is a lead, not a record — do not cite one as a position.

Ty Pinkins (Independent) No record found

No documented statement or action on data centers located. Not scored — see how this page treats silence.

Ballot roster: state candidate list (read 2026-08-25).

All 35 Senate races →

102026 U.S. House races in Mississippi (4)

A documented data-center record exists in 4 of 4 districts. A candidate with no badge colour has said nothing we could locate — that is a gap in the record, not a neutral position. ★ marks an incumbent.

DistrictPVIIncumbentCandidates
MS-1R+18Trent KellyTrent Kelly ★ Cliff Johnson
MS-2D+11Bennie ThompsonBennie Thompson ★ Ron Eller Bennie Foster
MS-3R+14Michael GuestMichael Guest ★ Michael Chiaradio Erik Kiehle
MS-4R+21Mike EzellMike Ezell ★ Jeffrey Hulum III Carl Boyanton
The documented records (4 districts)

MS-1

Trent Kelly (Republican) · incumbent Consensus vote only

On the record only for voting yes on H.R. 9340, the Ratepayer Protection Act (417-3). No other data-center record located yet.

  • Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)

Record read 2026-09-22.

MS-2

Bennie Thompson (Democratic) · incumbent Consensus vote only

On the record only for voting yes on H.R. 9340, the Ratepayer Protection Act (417-3). No other data-center record located yet.

  • Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)

Record read 2026-09-22.

MS-3

Michael Guest (Republican) · incumbent Consensus vote only

On the record only for voting yes on H.R. 9340, the Ratepayer Protection Act (417-3). No other data-center record located yet.

  • Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)

Record read 2026-09-22.

MS-4

Mike Ezell (Republican) · incumbent Consensus vote only

On the record only for voting yes on H.R. 9340, the Ratepayer Protection Act (417-3). No other data-center record located yet.

  • Voted yes on H.R. 9340, the Ratepayer Protection Act, which passed 417-3 (roll call 312). It directs state utility commissions to consider rate designs making data centers with 100 MW or more of peak demand at one site pay the full incremental cost of the generation and grid upgrades they require. A near-unanimous vote: shown on the record, not scored on its own. (2026-09-16 — source)

Record read 2026-09-22.

All 440 House races →

Stay informed
11Latest Mississippi data center news

All Mississippi news → Live news search →

A data center was proposed near you?

The free toolkit walks you through it in five steps: who's really behind the LLC, what it costs your community, what to do this week, and a downloadable action pack — speech, letters, flyer, and CBA targets included.

Start here → The health risks, sourced

State municipal league: Mississippi Municipal League

Toolkit States Tracker Search