Saxum Investment Data Center In review
230-acre rezoning request (agricultural/residential to heavy industrial) on Forest Ave in northwest Jackson. Hearing postponed May 27 after community pushback; City Council paused all DC construction June 23 pending new regulations.
Key facts
- Operator
- Saxum Investment Co.
- Size
- 230 ac
- Location
- Jackson, Mississippi
- Stage today
- In review
Source
read 2026-08-19
What to do next
Next step: An application is in the record. Ask the planning office for the next hearing date and request formal notice.
What has happened so far (2 events)
Find the paper trail
Find the paper trail (0 filed · 11 places to look)
State environmental permits
Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.
- Mississippi DEQ — Air DivisionThe program page: which permits this state requires, and the office that issues them.
- Search Mississippi DEQ — Air Division for this projectsearchThis state publishes no searchable permit database, so a written records request to the agency is the reliable route. Use this search only to find the right office.
County & town filings
The rezoning application, site plan, traffic and noise studies, staff report and every revision.
- Search Jackson planning filingssearchPlanning departments post application files under many different names. Find the department, then ask the clerk for the application number — that number unlocks everything else.
- Search Jackson property records / GISsearchThe parcel record names the buying LLC and the sale date, which is what ties an anonymous filing to an operator.
Utility & grid records
The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.
- MISO (Midwest & Gulf) — interconnection queueRequested megawatts, queue position and target in-service date. The MW here is the real number; the one at the town meeting is often phase one.
- Mississippi Public Service Commission — docket searchSpecial contracts, large-load tariffs and rate cases are docketed here. Testimony and exhibits are public, and are usually more candid than the press release.
- FERC eLibraryFederal filings: transmission agreements, interconnection service agreements, and co-location disputes.
- Search the serving utility for a will-serve lettersearchThe will-serve or load-service letter is the utility's own written commitment. Ask the utility and the PUC for it by name — it is frequently the first document to exist.
Federal databases
Works anywhere, and covers the operator's record at its other sites.
- EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 32.350, -90.250 — search that point with a 5-mile radius.
- EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
- EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.
These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.
Recent news
40 stories tracked since 2026-07-14 across 30 outlets. 29× A community is pushing back on a nearby data center. 9× Local officials are moving to pause or block the project. Most recent: “Bottoms & Jackson clash over healthcare & data centers” (FOX 5 Atlanta, 2026-10-07).
- Bottoms & Jackson clash over healthcare & data centers
- Jackson vs. Bottoms: 3 Biggest Takeaways From the Peach State Debate
- Keisha Lance Bottoms, Rick Jackson spar over economy, data centers and Trump in Georgia debate
- Bottoms and Jackson face off in gubernatorial town hall debate
- Keisha Lance Bottoms and Rick Jackson face off in Georgia gubernatorial debate
- Bottoms, Jackson clash over Flock cameras, data centers in Georgia debate
- Bottoms, Jackson face each other for first, and likely only, time in Georgia governor’s race
- Jackson, Bottoms clash over data centers, privacy and Trump in sole Georgia governor debate
- Bottoms confronts Jackson in governor debate
- Bottoms confronts Jackson in governor debate
- Bottoms and Jackson clash over Trump and data centers at Georgia governor debate
- Ga. voters’ top issues: Jackson, Bottoms face questions in debate
+28 more on the story tracker.
Automated news aggregation, not human-verified — follow each link to the original outlet. Part of the story tracker, 40 headlines archived.
Around here
- Jackson community briefing — Enactedexpires 2027-02-12
- Mississippi briefing — rates, grid carbon, PUC contacts.
Other tracked projects in Mississippi
- Amazon Ridgeland — Ridgeland, 9 mi Under construction
- Amazon Madison Mega Site — Canton (Madison County), 22 mi
- AWS Madison County data center campuses — Madison County, 23 mi Proposed
- Clarksdale hyperscale data center site — Clarksdale (Coahoma County), 129 mi In review
- Compass Datacenters Meridian — Meridian Under construction
Cite this page: GridWatch AI, “Saxum Investment Data Center”, aigridwatch.com/projects/saxum-jackson-ms, retrieved 2026-10-11.
As of August 2026 (2m ago) · changes weekly — re-check before citing
A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.
Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).