Project dossier · Clarksdale (Coahoma County), Mississippi

Clarksdale hyperscale data center site In review

Clarksdale rezoned a 648-acre site between the Sunflower River and Tallahatchie Street for a possible hyperscale campus, attaching conditions but naming no developer. No agreement has been signed and the end user is unknown.

Key facts

Size
648 ac
Location
Clarksdale (Coahoma County), Mississippi
First proposed
2026-03-10
Stage today
In review

Source
read 2026-08-23

What to do next

Next step: An application is in the record. Ask the planning office for the next hearing date and request formal notice.

Build an action pack for this project →

What has happened so far (3 events)

  • 2026-03-10announcement
    Clarksdale officials confirmed they were considering a hyperscale data center proposal on agricultural land inside the city, with the Crossroads Economic Partnership saying only that the counterparty is a global company. · source
  • 2026-03-18public-comment
    Residents of the Delta town, one of the poorest in Mississippi, described the prospect as a potential lifeline, while others pressed for guarantees on utility costs and jobs. · source
  • 2026-03-23rezoning
    The Clarksdale Board of Commissioners voted to rezone the 648-acre site with conditions: a $5 million impact fee paid before construction, developer-funded utility upgrades, emissions permits, and a 1,000-foot buffer from residential districts. Only the mayor and two commissioners were present. Mayor Orlando Paden stressed the vote does not approve a data center. · source

Find the paper trail

Find the paper trail (0 filed · 11 places to look)

State environmental permits

Backup generators, water withdrawal and stormwater are permitted by the state, usually earlier and in more detail than anything filed locally.

County & town filings

The rezoning application, site plan, traffic and noise studies, staff report and every revision.

Utility & grid records

The electricity request is filed with the grid operator and the utility long before the town hears about it — and states the real load.

Federal databases

Works anywhere, and covers the operator's record at its other sites.

  • EPA ECHO facility searchEvery federally-reported air, water and waste permit at a facility, plus its inspection and violation history. Search by address or draw a radius around the site. This project's locality centres on 34.200, -90.570 — search that point with a 5-mile radius.
  • EPA EnvirofactsThe same underlying records, queryable by county — useful for 'what else is permitted near this site' rather than one facility.
  • EPA Facility Registry ServiceResolves the shell LLC on a permit to the facility it belongs to. Worth a look when the filing name means nothing locally.

These are places to look, not evidence that anything has been filed. Links were checked on 2026-08-21; search links are queries, not records. What to ask for.

Around here

Other tracked projects in Mississippi

Cite this page: GridWatch AI, “Clarksdale hyperscale data center site”, aigridwatch.com/projects/clarksdale-data-center-ms, retrieved 2026-10-11.

As of August 2026 (2m ago) · changes weekly — re-check before citing

A working set of identified proposals a community can track, not a census — most of the country's activity is not in here yet. Pennsylvania is the exception: its rows are synced from PA DEP's own data-center permit tracker, so the state's coverage is close to complete and carries the permit trail with it. **Each row carries its own provenance.** Rows showing a verification date link to reporting or the governing body's own record and were read on that date; rows marked *unverified* have no source on record — a lead to check, not a fact to cite. **Stage is derived, not asserted.** *Hearing scheduled*, *Awaiting decision*, *Approved* and *Withdrawn* are computed from each row's milestone dates on every rebuild, so a hearing date that has passed stops reading 'scheduled'. Hearings get moved and projects re-file under new names — treat a scheduled date as the earliest to act by, and confirm with the clerk before relying on it. Leads are mined into data/project_candidates.json and promoted here only after a human reads a primary source.

Part of the data center project tracker — open data, CC BY 4.0 (JSON · CSV).

Toolkit States Tracker Search